[{"label":"Initial electronic-submittal corrections — St. Petersburg, read 2026-11-03","value":"10 business days; denial and workflow termination if not corrected; contact ePlan staff to reactivate.","source":"Building Permits, St. Petersburg, read 2026-11-03","url":"https://www.stpete.org/business/building_permitting/building_permits.php","read":"2026-11-03","fact_ids":"upload-deadline"},{"label":"Drawings for optional preliminary plan review — St. Petersburg, read 2026-11-03","value":"At least 7 business days before the meeting; drawings emailed as PDF.","source":"Building Permits, St. Petersburg, read 2026-11-03","url":"https://www.stpete.org/business/building_permitting/building_permits.php","read":"2026-11-03","fact_ids":"pprv-drawings"},{"label":"Contractor history in Click2Gov — St. Petersburg, read 2026-11-03","value":"Past 10 years; a user account is required for contractor history.","source":"Click2Gov Building Permit, St. Petersburg, read 2026-11-03","url":"https://stpe-egov.aspgov.com/Click2GovBP/index.html","read":"2026-11-03","fact_ids":"history-years"}]