[{"label":"Single-family roof: usual inspection count","value":"Generally 1 roof inspection, in progress while materials are being installed; spark arrester in place.","source":"Roofing Permit & Inspection Requirements | Daly City, CA, Daly City, read 2026-10-31","url":"https://www.dalycity.org/210/Roofing-Permit-Inspection-Requirements","read":"2026-10-31","fact_ids":"roof-inspections"},{"label":"Standard inspection request: advance notice","value":"At least two days before the inspection is needed.","source":"Inspections | Daly City, CA, Daly City, read 2026-10-31","url":"https://www.dalycity.org/259/Inspections","read":"2026-10-31","fact_ids":"inspection-lead"},{"label":"Inspection-day arrival estimates","value":"Posted by 8:00 AM; consult the portal after 8:00 AM for the current estimated arrival time.","source":"Inspections | Daly City, CA, Daly City, read 2026-10-31","url":"https://www.dalycity.org/259/Inspections","read":"2026-10-31","fact_ids":"inspection-arrival"}]