{
  "page": "https://instabids.ai/us/oh/butler/hamilton/building-permits",
  "title": "Hamilton Permit Search: Apply and Building Rules",
  "skill": "permits@3.4.12",
  "updated": "2026-11-06",
  "rows": [
    {
      "label": "Typical departmental plan review — Hamilton, read November 6, 2026",
      "value": "Around 10 working days from application to completion of departmental reviews; results follow. Issuance depends on the plan-review outcome.",
      "source": "Hiring A Contractor — City of Hamilton, OH, City of Hamilton, read 2026-11-06",
      "url": "https://www.hamilton-oh.gov/building-hiring-a-contractor",
      "read": "2026-11-06",
      "fact_ids": "review"
    },
    {
      "label": "Most residential submissions — Hamilton, read November 6, 2026",
      "value": "2 copies of drawings and documents; confirm the required sets with the office before preparing the submission.",
      "source": "Hiring A Contractor — City of Hamilton, OH, City of Hamilton, read 2026-11-06",
      "url": "https://www.hamilton-oh.gov/building-hiring-a-contractor",
      "read": "2026-11-06",
      "fact_ids": "plan-copies"
    },
    {
      "label": "Occupied-property inspection attendance — Hamilton, read November 6, 2026",
      "value": "Owner or authorized representative age 18 or older must be present; no exceptions.",
      "source": "Inspections — City of Hamilton, OH, City of Hamilton, read 2026-11-06",
      "url": "https://www.hamilton-oh.gov/building-inspections",
      "read": "2026-11-06",
      "fact_ids": "inspection-age"
    },
    {
      "label": "Weekday inspection window — Hamilton, read November 6, 2026",
      "value": "Monday through Friday, 9 a.m. - 3:00 p.m.",
      "source": "Inspections — City of Hamilton, OH, City of Hamilton, read 2026-11-06",
      "url": "https://www.hamilton-oh.gov/building-inspections",
      "read": "2026-11-06",
      "fact_ids": "inspection-window"
    }
  ]
}
