[{"caption":"Land survey types: choose the information you need","columns":[{"key":"purpose","label":"What the deliverable covers","source_line":"USDA NRCS (2022), ALTA/NSPS (2026), FEMA/NFIP (undated); read 2026-11-10."},{"key":"fit","label":"Job purpose","source_line":"Primary-source scope descriptions; read 2026-11-10."}],"rows":[{"option":"boundary","label":"Boundary / cadastral","cells":{"purpose":{"text":"Property lines and corners","facts":["U1"]},"fit":{"text":"Property-line or corner location","facts":["U1"]}}},{"option":"topographic","label":"Topographic","cells":{"purpose":{"text":"Ground elevations and contours","facts":["U2"]},"fit":{"text":"Ground shape for design","facts":["U2"]}}},{"option":"construction","label":"Construction layout","cells":{"purpose":{"text":"Horizontal and vertical construction positions","facts":["U3"]},"fit":{"text":"Positions needed during construction","facts":["U3"]}}},{"option":"as-built","label":"As-built","cells":{"purpose":{"text":"Final constructed positions and changes","facts":["U4"]},"fit":{"text":"Documenting what was built","facts":["U4"]}}},{"option":"control","label":"Control","cells":{"purpose":{"text":"Reference monuments for other surveys","facts":["U5"]},"fit":{"text":"Reference framework for survey work","facts":["U5"]}}},{"option":"hydrographic","label":"Hydrographic","cells":{"purpose":{"text":"Water boundaries and depths","facts":["U6"]},"fit":{"text":"Shoreline or underwater information","facts":["U6"]}}},{"option":"route","label":"Route","cells":{"purpose":{"text":"Roads, pipelines and other linear projects","facts":["U7"]},"fit":{"text":"Planning a route","facts":["U7"]}}},{"option":"alta","label":"ALTA/NSPS land title","cells":{"purpose":{"text":"Fieldwork, boundary evidence and a plat or map","facts":["A1","A2","A7"]},"fit":{"text":"Title-related survey scope requested by the parties","facts":["A1","A2","A7"]}}},{"option":"elevation","label":"Elevation certificate","cells":{"purpose":{"text":"Building height relative to expected floodwater","facts":["F1"]},"fit":{"text":"Flood-elevation documentation","facts":["F1"]}}}]},{"caption":"ALTA scope thresholds: precision and fieldwork reach are different","columns":[{"key":"limit","label":"Published threshold","source_line":"ALTA/NSPS 2026 sections 3.E.v, 5.C.ii and 5.E.iv; read 2026-11-10."}],"rows":[{"option":"precision","label":"Relative positional precision","cells":{"limit":{"text":"2 cm (0.07 feet) plus 50 parts per million; a measurement ceiling with stated exceptions, not proof of boundary correctness.","facts":["A3","A6"]}}},{"option":"improvements","label":"Boundary-adjacent improvements","cells":{"limit":{"text":"Within five feet of each side of boundary lines, unless access is restricted; observed improvements, not all vegetation.","facts":["A4"]}}},{"option":"poles","label":"Utility poles","cells":{"limit":{"text":"On or within ten feet of the property, as observed during fieldwork; underground utility mapping is a separate scope question.","facts":["A5"]}}}]}]