Apartment flooring written-scope checklist (What should an apartment flooring bid include?) From https://instabids.ai/us/property-managers/apartment-communities/flooring (facts read 2026-11-06) [ ] Water-resistant hard-surface flooring: list kitchens, bathrooms, entryways, laundry areas and utility rooms in the proposal. [ ] Water penetration to the subfloor: include condition photos and identify the proposed investigation of moisture beneath the finish floor. [ ] Flooring continuous under fixtures and cabinets: show the wet-area boundaries and manufacturer’s specifications. [ ] Sanding or leveling asbestos flooring: identify existing-condition concerns and how the proposed floor preparation addresses EPA’s warning. [ ] Power stripping: keep EPA’s warning for flooring that may contain asbestos in the proposed work description. [ ] Maximum ventilation: show installation work and the recommended at least 72 hours afterward on the schedule. [ ] Sealed floor-edge detail: identify the baseboard or turned-up floor approach and request completion photos. [ ] Clear chemical sealants on sealed concrete flooring: record the product, application date and care instructions alongside the 1 to 2 years reapplication interval.