What to put in a written repair scope for a Kentucky rental (What do Kentucky landlord tenant laws say about repairs, entry and deposits?) From https://instabids.ai/us/property-managers/landlord-tenant-law/kentucky (facts read 2026-10-30) [ ] The repair in plain words, with photos, tied to the 383.595(1) paragraph the landlord shall meet: make all repairs and do whatever is necessary to put and keep the premises in a fit and habitable condition (383.595(1)(b)), or maintain in good and safe working order the facilities and appliances supplied or required to be supplied by him (383.595(1)(d)). [ ] The date the tenant's written notice was received, since 383.625(1) counts fourteen (14) days to remedy a material noncompliance or a noncompliance with KRS 383.595 materially affecting health and safety. [ ] The access window, set at least two (2) days after the landlord's notice of intent to enter, except in case of emergency (383.615(3)). [ ] For a heat or hot water job: the dates, since 383.595(1)(e) names reasonable heat between October 1 and May 1, except where heat is generated by an installation within the exclusive control of the tenant. [ ] For move-out repairs: the landlord's comprehensive listing of any damage to the unit with the estimated cost of repairing each item, as 383.580(3) has the landlord compile at the termination of occupancy.