Rental flooring written-scope checklist (What should rental property flooring work include?) From https://instabids.ai/us/property-managers/rental-property/flooring (facts read 2026-11-06) [ ] Clean water on linoleum, ceramic tile or vinyl flooring: describe surface cleanup and how underflooring drying is included. [ ] Subfloor under carpet or other flooring after clean water damage: identify cleaning, drying and proposed completion photos. [ ] Hardwood floors after clean water damage: document the proposed drying method and the caution when applying heat. [ ] Sheet vinyl flooring: name the adhesive-applied or heavier floating-floor construction in the material proposal. [ ] Floor penetrations: list unnecessary openings and the proposed caulk and seal detail at necessary plumbing pipe penetrations. [ ] Floor drain: where included in wet-area work, identify the proposed connection to the home’s sewer system. [ ] Non-paper-faced drywall: show the at least ½-inch clearance above the finished floor in wet-area construction details. [ ] First-floor flooring in areas prone to flooding: identify the proposed easy-to-clean, water-resistant material.