{"skill_version":"3.4.3","rows":[{"label":"Pasadena generator gas-test hold, effective 2025-09-01","value":"30 minutes at a minimum of 30 psi on a Spring Gauge","source":"SB 1202 (effective September 1, 2025) | Pasadena, TX, Pasadena, Texas, read 2026-11-01","url":"https://www.pasadenatx.gov/1998/SB-1202-effective-September-1-2025","read":"2026-11-01","fact_ids":"generator-gas-test"},{"label":"Harris County, Texas: new housing units in 1-unit buildings, 2025","value":"16,940","source":"Census Bureau Building Permits Survey, annual county file 2025, Harris County, Texas (county grain), read 2026-11-01T19:35:31.301314+00:00","url":"https://www2.census.gov/econ/bps/County/co2025a.txt","read":"2026-11-01T19:35:31.301314+00:00","fact_ids":"harris-single-units"},{"label":"Harris County, Texas: new housing units in buildings with 5 or more units, 2025","value":"11,737","source":"Census Bureau Building Permits Survey, annual county file 2025, Harris County, Texas (county grain), read 2026-11-01T19:35:31.301314+00:00","url":"https://www2.census.gov/econ/bps/County/co2025a.txt","read":"2026-11-01T19:35:31.301314+00:00","fact_ids":"harris-large-units"}]}