{"page":"https://instabids.ai/us/wa/spokane/spokane-valley/building-permits","title":"Spokane Valley Permit Search: Look Up, Apply, Rules","skill":"permits@3.4.3","updated":"2026-11-01","rows":[{"label":"Spokane Valley portal access — as of November 1, 2026","value":"“The portal is available 24/7.”","source":"Permitting | Spokane Valley, WA, City of Spokane Valley, read 2026-11-01","url":"https://www.spokanevalleywa.gov/289/Permitting","read":"2026-11-01","fact_ids":"portal-hours"},{"label":"Spokane Valley inspection request cutoff — as of November 1, 2026","value":"“Inspection requests received via the portal or the Inspection Request Line before 7 a.m. will generally be performed on the same business day. Requests received after 7 a.m. will be scheduled for the next business day.”","source":"Building Inspections | Spokane Valley, WA, City of Spokane Valley, read 2026-11-01","url":"https://www.spokanevalleywa.gov/228/Building-Inspections","read":"2026-11-01","fact_ids":"inspection-timing"},{"label":"Spokane Valley application validity — SVMC 24.40.030(B)(1), as of November 1, 2026","value":"“Applications are valid for one year. One or more extensions of time may be granted for a term of not more than 180 days but shall not exceed the time remaining in the code cycle to which the application is vested. Any request for extension shall be made in writing. All permit applications regulated by SVMC Title 24 shall be deemed to be abandoned and become null and void if a permit is not issued within the time limits described herein.”","source":"Chapter 24.40 Codes Adopted - City of Spokane Valley, City of Spokane Valley, read 2026-11-01","url":"https://ecode360.com/48524621","read":"2026-11-01","fact_ids":"application-validity"}]}