InstaBidsInstaBids
Skip to content
InstaBids
Menu
Use your AIStart my request

Scottsdale permit search

Scottsdale SPUR is the city’s planning and permitting portal, and its public Search finds project records by address, permit number or keyword. Projects initiated after Jan. 6, 2026 are managed in SPUR; projects initiated before that date generally stay in the legacy eServices system. The City of Scottsdale says: “Projects that require construction, structural improvements, demolition, or adding or relocating mechanical, electrical, or plumbing systems require a permit.” Search Scottsdale SPUR records

InstaBids is an AI-run marketplace for homeowners and property managers: describe a home job once, by chat or through your own AI assistant, add photos, and get multiple written quotes on the same scope, compared apples to apples, with no phone calls or home visits before you pick.

Sources read: 2026-10-29Updated 2026-10-29

InstaBids assistantAI · builds your written scope with you

What home job do you need done in Scottsdale, Arizona? Describe it once to start your written scope.

Start from a common job
You choose who gets your number
Or send it from your own AIChatGPTClaudeGrokGeminiMore ways
  1. Describe it onceBy chat, or through your own AI assistant, and add photos.
  2. Post it and send itContractors bid in writing on that scope.
  3. Compare line by lineEvery quote is written against the same scope.
  4. You chooseContact details stay hidden until you pick and they confirm.
InstaBids

For your AI assistant

MCP connector · REST API · plain HTML

Hand any of these to your assistant and it can help you write this job's request; you send the request yourself. What you type in the job box above goes into the prompt these buttons carry. The connector asks you to sign in to your InstaBids account the first time.

  • MCP connector URLhttps://instabids.ai/api/agent/mcp
  • Agent API (OpenAPI)https://instabids.ai/openapi.json
  • Start-request linkhttps://instabids.ai/intake?from=permits-az--maricopa--scottsdale--building-permits&utm_source=permits&utm_medium=page&utm_campaign=permits-v3
Open it in your assistantAdd InstaBids as a connector

Every page is plain HTML. Steps for every assistant: add to your assistant.

Scottsdale permit review times at a glance

Plan review, single-family residential7 business days of administrative review, then 15 business days of substantive reviewResidential Plan Review, City of Scottsdale (authority grain), read 2026-10-29
Plan review, pools, fences and walls5 business days of administrative review, then 5 business days of substantive reviewResidential Plan Review, City of Scottsdale (authority grain), read 2026-10-29
First inspection after the permit is issuedWithin 180 days, or the permit expiresHome Improvement, City of Scottsdale (authority grain), read 2026-10-29
Inspection hours6 a.m. to 2:30 p.m. in summer (April to October); 7 a.m. to 3:30 p.m. in winter (November to March)Inspection Services, City of Scottsdale (authority grain), read 2026-10-29

Download this table: CSV · JSON

Scottsdale permit status

With a SPUR account, the dashboard’s My Work tab lists your permits and their status, and a record’s Workflow tab shows where an application sits in the process. Plans submitted in the legacy system have their own Plan Review Search.

You can manage every aspect of your project (apply, pay fees, check status, upload documents, schedule inspections) in the SPUR portal.

Source: Scottsdale SPUR, read 2026-10-29

If the city moves an existing project from eServices to SPUR, city staff notify you.

Scottsdale permit application

A Scottsdale permit request is a completed application submitted in SPUR. Accounts from the legacy eServices system were not carried over, so create a new SPUR account with Register before you apply.

To apply for any of these permits click “Apply” in the SPUR portal and enter the permit type or keywords in the search field.

Source: Home Improvement, read 2026-10-29

Permits other than Minimum Permits begin with plan review. A Minimum Permit covers single-trade work and needs no plan review, only the Minimum Permit application.

Do I need a permit for a fence in Scottsdale?

Yes, for a new wall or fence taller than 3 feet, measured from natural grade inside the enclosure. A wall of 3 feet or less, other than a retaining wall, needs no permit but does go through a courtesy site plan review.

A building permit is required for the construction of new walls/fences taller than 3 feet, including wood, wrought iron, & corral fencing. A permit is required when adding additional height to an existing wall, or repairing a damaged wall (i.e. vehicle accident).

Source: Fence and Masonry Wall, read 2026-10-29

The city’s wall and fence guidelines name footing, masonry grout, masonry bond beam and final as the typical inspections, and note that actual inspections can vary by project.

Start my request for a fence in Scottsdale

Do I need a permit to repair or replace a roof in Scottsdale?

Re-roofing with the same roofing material is one of the repair and replacement examples Scottsdale lists as work done without a permit. Roof work that changes the structure falls under the city’s general rule, which requires a permit for structural improvements.

Re-roofing when the same roofing material is used

Source: Home Improvement, read 2026-10-29

Start my request for a roof repair or replacement in Scottsdale

Do I need a permit for a shed in Scottsdale?

A detached tool or storage shed needs a building permit when it exceeds 200 square feet of projected floor area, and electrical or plumbing run to it needs a permit at any size. A detached, non-habitable structure smaller than 200 square feet with no utility connections needs no permit but goes through a courtesy plan review with a site plan.

A building permit is required for the construction of a detached accessory building, used as a tool or storage shed that exceeds 200 square feet of projected floor area. Any electrical or plumbing that is run to the accessory structure requires a permit regardless of the buildings size.

Source: Detached Garage & Storage Shed, read 2026-10-29

The city’s shed handout asks for a plot plan showing the streets, property lines, structures and setback dimensions.

Start my request for a shed in Scottsdale

Can a homeowner pull their own permit in Scottsdale?

Scottsdale’s wall and fence guidelines say an owner-occupied single-family property owner can do the work themselves or act as their own general contractor and hire subcontractors. An owner who does so signs the Owner-Builder Declaration form required by the city’s Tax Audit Division.

To properly advise you of tax reporting responsibilities, the owner, or authorized agent of the owner, is to complete and submit the attached Owner-Builder Form.

Source: Owner Builder Statement, read 2026-10-29

The form is completed when applying for a permit. When the improvement is built for the owner’s use, the owner also submits a C-2 Form five days before final inspection.

What work does not need a permit in Scottsdale?

Cosmetic projects with no structural change and no skilled trades generally need no permit. Scottsdale lists repair and replacement examples that a homeowner or their contracted professional can do without one, including these.

Source: Home Improvement, read 2026-10-29

Patio slabs, sidewalks and drives not over 30 inches above grade need no permit but go through a courtesy review by Planning & Development Services.

How much is a permit and how long does it take in Scottsdale?

City permit fees, FY26-27 schedule effective July 1, 2026

These lines come from the city’s permit fee schedule, Exhibit A to Resolution No. 13661, effective July 1, 2026. A single-trade job such as a water heater replacement can take a Minimum Permit, and fences and retaining walls are charged per linear foot. Review fees are paid after administrative review, and an application is not processed until payment is received. The schedule notes it is not all-inclusive and other fees may apply. These are city permit fees, not the price of the job.

Minimum Permit (one discipline) $121

Source: Permit Fee Schedule - Miscellaneous, read 2026-10-29

Minimum Combination (all disciplines) $379

Source: Permit Fee Schedule - Miscellaneous, read 2026-10-29

Water Heaters (except solar) $63

Source: Permit Fee Schedule - Miscellaneous, read 2026-10-29

Fence walls Base fee $237 Linear footage $0.27 ln. ft.

Source: Permit Fee Schedule - Residential, read 2026-10-29

For single-family residential plans, the city lists 7 business days for administrative review and 15 business days for substantive review. Pools, fences and walls are listed at 5 business days for each stage. Substantive review covers five disciplines: Planning, Building, Engineering, Stormwater and Fire.

Work completed without a permit will be fined an amount equal to double the permit fee.

Source: Home Improvement, read 2026-10-29

After the permit is issued, the first inspection must happen within 180 days or the permit expires, and each later inspection within 180 days of the one before.

Before you apply in Scottsdale: checklist

Required documents depend on the project’s scope. Construction documents must show the location, nature and extent of the work and how it conforms to the adopted construction codes.

Before uploading to SPUR, remove files attached inside PDFs and any file security, and reduce file size without dropping clarity below 300 DPI.

For a wall or fence, the guidelines ask for 3 site plans, and a wall on a shared property line needs the written authorization of that property owner. A shed needs a plot plan with setback dimensions.

Subdivision covenants, conditions and restrictions (CC&Rs) may govern some of these items even though they are not regulated by the city. Check with your homeowners association before proceeding.

Source: Home Improvement, read 2026-10-29

How do I contact the Scottsdale building department?

Planning and Development Services runs the One Stop Shop, where information on case submittals, plan submittals, permits and development records is in one location.

The One Stop Shop opens at 9 a.m. and Permitting (Development Services) opens at 1 p.m. on Wednesdays. On all other weekdays, our hours are 8 a.m. to 5 p.m.

Source: One Stop Shop, read 2026-10-29

The One Stop Shop accepts no new monetary transactions after 4 p.m.

Sources

Start my requestUse your AI