How much will solar panels cost in Los Angeles?
Solar panel installation in Los Angeles, CA had a median declared permit value of $20,000 (City of Los Angeles permit, 2023-2026, n=72, read 2026-10-22). To identify which Los Angeles solar panels work belongs in a permit application, see “Which Los Angeles solar panels repairs need a permit?”
Updated 2026-11-18
InstaBids is an AI-run marketplace for homeowners and property managers: describe a home job once, by chat or through your own AI assistant, add photos, and get multiple written quotes on the same scope, compared apples to apples, with no phone calls or home visits before you pick.
For homeowners, property managers, landlords and HOA boards.
| What was measured | Median declared value | Declared value range (middle half) |
|---|---|---|
| Residential solar panels permits issued in Los Angeles declared | a median declared value on building permits of $20,000 | the typical range (middle half of 72 City of Los Angeles permit data points, Los Angeles, CA, 2023-2026) was $10,000 to $32,774 |
Declared permit values are what applicants reported to the city; final contract prices can differ.
How measured: residential single-job permits; declared values below the low-value floor for the same job removed (0 rows). Source: City of Los Angeles, LADBS 'Building Permits Issued from 2020 to Present' (pi9x-tg5x), data read 22 October 2026.
These figures are estimates from City of Los Angeles, LADBS 'Building Permits Issued from 2020 to Present' (pi9x-tg5x), data years 2023-2026, read 22 October 2026, for Los Angeles, CA. They are not a quote, and they are not a promise of what any contractor on InstaBids will charge. Your price depends on your home, the materials and the contractor. Get written bids before you decide.
- Describe it onceBy chat, or through your own AI assistant, and add photos.
- Post it and send itContractors bid in writing on that scope.
- Compare line by lineEvery quote is written against the same scope.
- You chooseContact details stay hidden until you pick and they confirm.
For your AI assistant
MCP connector · REST API · plain HTMLHand any of these to your assistant and it can help you write this job's request; you send the request yourself. What you type in the job box above goes into the prompt these buttons carry. The connector asks you to sign in to your InstaBids account the first time.
- MCP connector URL
https://instabids.ai/api/agent/mcp - Agent API (OpenAPI)
https://instabids.ai/openapi.json - Start-request link
https://instabids.ai/intake?page_type=cost&job=solar+panels&place=los+angeles&from=cost-solar-panels--los-angeles&utm_source=us&utm_medium=page&utm_campaign=cost - Prompt for any AI, with your job
- ChatGPTOpens with the prompt
- ClaudeOpens with the prompt
- GrokOpens with the prompt
- GeminiCopies the prompt, then opens
Every page is plain HTML. Steps for every assistant: add to your assistant.
What the job includes, the line items to ask for and how to compare bids: the national solar panel installation cost guide.
What do Los Angeles solar panels permits declare?
solar panels, Los Angeles, CA: 2023-01 to 2026-10; data years 2023-2026; read 2026-10-22. 72 matched permits; 72 valued (fill 100%); 72 retained for the middle-half range above; 0 low-value exclusions (0%).
Excluded before matching: 102 new-dwelling or non-existing-home; 50 administrative; 12 combined-job.
Other Los Angeles, CA retained job samples: garage, n=145; deck, n=357 (2023-01 to 2026-09).
Source: City of Los Angeles, LADBS 'Building Permits Issued from 2020 to Present' (pi9x-tg5x), read 22 October 2026
Which Los Angeles solar panels repairs need a permit?
Example rule, Los Angeles Department of Building and Safety — P/GI 2023-027 Solar Energy Systems: Flush-mounted residential exception conditions: “Exception 2: A building permit is not required for flush mounted rooftop system installations on one- or two-family dwelling, when all of the following conditions are met: a. The roof has only one layer of roofing material. b. The roof structure appears structurally sound, without signs of alterations or structural deterioration or sagging. c. The plane of the modules (panels) is parallel to the plane of the roof. d. There is a gap of minimum 2” and maximum 10” between the underside of the module and the roof surface. e. Modules do not overhang any roof edges (ridges, hips, gable ends, eaves). f. The modules and support components combined weigh no more than 4 psf for photovoltaic arrays or 5 psf for solar thermal arrays. g. The array covers no more than half of the total roof area comprising all roof planes. h. A roof plan showing the module and anchor layout is provided to the field inspector. The plan shall also show the roof rafter layout. i. Solar support component manufacturer’s project-specific completed worksheets, tables with relevant cells circled, or web-based calculator results are attached to the plans. j. A roof plan showing the module and anchor layout is provided. The plan shall also show the roof rafter layout. k. 5/16” diameter lag screws with 2.5” embedment into the rafter are used, or the anchor fastener recommended by the manufacturer’s guidelines, whichever is more stringent. l. Structural design shall follow the “Structural Criteria for Residential Rooftop Solar Energy Installations” in the 2019 California Solar Permitting Guidebook (4th Edition).”
Example rule, Los Angeles Department of Building and Safety — P/GI 2023-027 Solar Energy Systems: Electrical permit route and plan-check conditions: “A. Electrical Permits: An electrical permit is required for the installation of solar photovoltaic systems. Permits are issued as follows: 1. Online Permits: Installations meeting the following criteria are issued online at http://www.LADBS.org and the installation shall meet the approved plans generated through the online system: a. A rooftop system on a one- or two-family dwelling. b. The total capacity of the photovoltaic system being installed is 10 kW or less. c. No GFCI or AFCI overcurrent devices are installed in the alternating current (AC) output of the inverter. d. AC Power system shall be 120/240 volts single phase. e. The rating of the service panel shall not exceed 225 amperes. f. Central/String inverter systems with a maximum of two inverters with up to four strings and one combiner box per inverter. g. Micro inverter systems having up to four branch circuits. 2. Permits for systems that require plan check: Installations that do not meet the criteria for Online Permits shall require plan check. Once the plans are approved, the Electrical Plan Check Section will issue the permit.”
Example rule, Los Angeles Department of Building and Safety — P/GI 2023-027 Solar Energy Systems: Onsite inspection preparation: “A. General Inspection Requirements: 1. All approved plans and related technical specifications shall be available onsite at the time of inspection. 2. All applicable permits must be obtained prior to inspection of the solar energy system. 3. A person familiar with the installation shall be available onsite to answer questions and provide access (including a ladder) or other accommodations necessary to perform the inspection of all components of the solar energy system. Ladder installations shall comply with the California Code of Regulations, Title 8. 4.”
Source: Los Angeles Department of Building and Safety — P/GI 2023-027 Solar Energy Systems, read 18 November 2026
Get written bids
Contractors who take part bid on one written scope card, so nobody visits before you see any prices.
Sources for the figures on this page
- City of Los Angeles, LADBS 'Building Permits Issued from 2020 to Present' (pi9x-tg5x), https://data.lacity.org/City-Infrastructure-Service-Requests/Building-and-Safety-Building-Permits-Issued-from-20/pi9x-tg5x, read 22 October 2026. InstaBids computed medians and middle-half ranges.
- Los Angeles Department of Building and Safety — P/GI 2023-027 Solar Energy Systems, dbs.lacity.gov/sites/default/files/efs/forms/pc17/ib-p-gi-2020-027.pdf, read 18 November 2026.