Do you have to give a contractor an opportunity to fix defects before you sue?
In some states, yes, when the dispute falls under that state's construction defect law. Florida, Texas, Washington and Arizona each require written notice of the defects before a lawsuit is filed, and each lets the contractor or seller inspect and offer a repair. Their own words are quoted below.
Source: Florida Statutes chapter 558, Construction Defects, Florida Legislature, read 22 October 2026.
Source: Texas Property Code chapter 27, Residential Construction Liability, Texas Legislature, read 22 October 2026.
Source: RCW 64.50.020, Construction defect action, notice of claim, Washington State Legislature, read 22 October 2026.
Source: Arizona Revised Statutes 12-1363, Notice and right to repair or replace, Arizona Legislature, read 22 October 2026.
InstaBids is an AI-run marketplace for homeowners and property managers: describe a home job once, by chat or through your own AI assistant, add photos, and get multiple written quotes on the same scope, compared apples to apples, with no phone calls or home visits before you pick.
For homeowners.
- Describe it onceBy chat, or through your own AI assistant, and add photos.
- Post it and send itContractors bid in writing on that scope.
- Compare line by lineEvery quote is written against the same scope.
- You chooseContact details stay hidden until you pick and they confirm.
Use with your AI
Key facts
- Fla. Stat. s. 558.003, on suing first: "A claimant may not file an action subject to this chapter without first complying with the requirements of this chapter."
Source: Florida Statutes chapter 558, Construction Defects, Florida Legislature, read 22 October 2026.
- Tex. Prop. Code s. 27.004(b), on the contractor's offer: "(b) Not later than the 60th day after the date the contractor receives the notice under this section, the contractor may make a written offer of settlement to the claimant."
Source: Texas Property Code chapter 27, Residential Construction Liability, Texas Legislature, read 22 October 2026.
- RCW 64.50.010(1), on what the Washington chapter covers: "means any civil lawsuit or action in contract or tort for damages or indemnity brought against a construction professional to assert a claim, whether by complaint, counterclaim, or cross-claim, for damage or the loss of use of real or personal property caused by a defect in the construction of a residence or in the substantial remodel of a residence."
Source: RCW 64.50.010, Definitions, Washington State Legislature, read 22 October 2026.
- A.R.S. 12-1363(D), if the seller does not answer: "D. If the seller does not provide a written response to the purchaser's notice within sixty days, the purchaser may file a dwelling action."
Source: Arizona Revised Statutes 12-1363, Notice and right to repair or replace, Arizona Legislature, read 22 October 2026.
What does Florida's chapter 558 require before you sue?
Notice first, for a claim the chapter covers: Florida's chapter 558 says a claimant may not file an action subject to this chapter without first complying with the requirements of this chapter. The sentences on timing, detail, inspection, the contractor's written response, when the chapter applies and what a court does with a case filed too soon are quoted below in their own words.
Source: Florida Statutes chapter 558, Construction Defects, Florida Legislature, read 22 October 2026.
- Fla. Stat. s. 558.004(1)(a), on the notice: "(1)(a) In actions brought alleging a construction defect, the claimant shall, at least 60 days before filing any action, or at least 120 days before filing an action involving an association representing more than 20 parcels, serve written notice of claim on the contractor, subcontractor, supplier, or design professional, as applicable, which notice shall refer to this chapter." "If the construction defect claim arises from work performed under a contract, the written notice of claim must be served on the person with whom the claimant contracted."
Source: Florida Statutes chapter 558, Construction Defects, Florida Legislature, read 22 October 2026.
- Section 558.004(1)(b), on what the notice says: "(b) The notice of claim must describe in reasonable detail the nature of each alleged construction defect and, if known, the damage or loss resulting from the defect."
Source: Florida Statutes chapter 558, Construction Defects, Florida Legislature, read 22 October 2026.
- Section 558.004(2), on the inspection: "(2) Within 30 days after service of the notice of claim, or within 50 days after service of the notice of claim involving an association representing more than 20 parcels, the person served with the notice of claim under subsection (1) is entitled to perform a reasonable inspection of the property or of each unit subject to the claim to assess each alleged construction defect."
Source: Florida Statutes chapter 558, Construction Defects, Florida Legislature, read 22 October 2026.
- Section 558.004(5), on the response, says "the person who was served the notice under subsection (1) must serve a written response to the claimant." Two of its listed options read: "(a) A written offer to remedy the alleged construction defect at no cost to the claimant, a detailed description of the proposed repairs necessary to remedy the defect, and a timetable for the completion of such repairs;" and "(d) A written statement that the person disputes the claim and will not remedy the defect or compromise and settle the claim;"
Source: Florida Statutes chapter 558, Construction Defects, Florida Legislature, read 22 October 2026.
- Section 558.005(1), on when the chapter applies: "(1) Unless a claimant and a potential defendant have agreed in writing to opt out of the requirements of this section, the provisions of this chapter shall apply to any claim for legal relief for which the agreement to make the improvement was made after October 1, 2009, and for which the basis of the claim is a construction defect that has arisen after completion of a building or improvement."
Source: Florida Statutes chapter 558, Construction Defects, Florida Legislature, read 22 October 2026.
- Section 558.003, on a job that is not finished: "The notice is not required for a project that has not reached the stage of completion of the building or improvement."
Source: Florida Statutes chapter 558, Construction Defects, Florida Legislature, read 22 October 2026.
- Section 558.003, if you file first: "If a claimant files an action alleging a construction defect without first complying with the requirements of this chapter, on timely motion by a party to the action the court shall stay the action, without prejudice, and the action may not proceed until the claimant has complied with such requirements."
Source: Florida Statutes chapter 558, Construction Defects, Florida Legislature, read 22 October 2026.
Section 558.005(6) also gives the wording a written contract between an owner and a contractor must contain: "ANY CLAIMS FOR CONSTRUCTION DEFECTS ARE SUBJECT TO THE NOTICE AND CURE PROVISIONS OF CHAPTER 558, FLORIDA STATUTES." The same subsection adds: "The failure to include in the contract the notice provided in this subsection does not subject the contracting owner, contractor, or design professional to any penalty."
Source: Florida Statutes chapter 558, Construction Defects, Florida Legislature, read 22 October 2026.
What does Texas Property Code chapter 27 require first?
A written notice sent before the case is filed. Texas Property Code chapter 27 says that before the 60th day preceding the date a claimant initiates an action, the claimant shall give written notice to the contractor. Its definition of a construction defect, which names an alteration of or repair or addition to an existing residence, is quoted first, then the notice, inspection and offer steps and the abatement rule.
Source: Texas Property Code chapter 27, Residential Construction Liability, Texas Legislature, read 22 October 2026.
- Tex. Prop. Code s. 27.001(3), the definition of construction defect: "means a deficiency in the design, construction, or repair of a new residence, of an alteration of or repair or addition to an existing residence, or of an appurtenance to a residence, on which a person has a complaint against a contractor."
Source: Texas Property Code chapter 27, Residential Construction Liability, Texas Legislature, read 22 October 2026.
- Section 27.004(a), on the notice: "(a) Before the 60th day preceding the date a claimant seeking from a contractor damages or other relief arising from a construction defect initiates an action, the claimant shall give written notice by certified mail, return receipt requested, to the contractor, at the contractor's last known address, specifying in reasonable detail the construction defects that are the subject of the complaint."
Source: Texas Property Code chapter 27, Residential Construction Liability, Texas Legislature, read 22 October 2026.
- The same subsection, on the inspection: "During the 35-day period after the date the contractor receives the notice, and on the contractor's written request, the contractor shall be given a reasonable opportunity to inspect and have inspected the property that is the subject of the complaint to determine the nature and cause of the defect and the nature and extent of repairs necessary to remedy the defect."
Source: Texas Property Code chapter 27, Residential Construction Liability, Texas Legislature, read 22 October 2026.
- Section 27.004(b), on the offer: "(b) Not later than the 60th day after the date the contractor receives the notice under this section, the contractor may make a written offer of settlement to the claimant."
Source: Texas Property Code chapter 27, Residential Construction Liability, Texas Legislature, read 22 October 2026.
- Section 27.004(c), on a case that has to be filed sooner: "(c) If the giving of the notice under Subsections (a) and (b) within the period prescribed by those subsections is impracticable because of the necessity of initiating an action at an earlier date to prevent expiration of the statute of limitations or if the complaint is asserted as a counterclaim, the notice is not required."
Source: Texas Property Code chapter 27, Residential Construction Liability, Texas Legislature, read 22 October 2026.
- Section 27.004(d), if notice or inspection was skipped: "(d) The court or arbitration tribunal shall abate an action governed by this chapter if Subsection (c) does not apply and the court or tribunal, after a hearing, finds that the contractor is entitled to abatement because the claimant failed to provide the notice or failed to give the contractor a reasonable opportunity to inspect the property as required by Subsection (a) or failed to follow the procedures specified by Subsection (b)."
Source: Texas Property Code chapter 27, Residential Construction Liability, Texas Legislature, read 22 October 2026.
Does Washington's notice-of-claim law cover a home remodel?
In our reading, only a substantial remodel, as the chapter defines it. RCW 64.50.010 defines an action under the chapter as one over a defect in the construction of a residence or in the substantial remodel of a residence. That definition, the definition of substantial remodel and the notice rule are quoted below.
Source: RCW 64.50.010, Definitions, Washington State Legislature, read 22 October 2026.
- RCW 64.50.010(1), the definition of action: "means any civil lawsuit or action in contract or tort for damages or indemnity brought against a construction professional to assert a claim, whether by complaint, counterclaim, or cross-claim, for damage or the loss of use of real or personal property caused by a defect in the construction of a residence or in the substantial remodel of a residence."
Source: RCW 64.50.010, Definitions, Washington State Legislature, read 22 October 2026.
- RCW 64.50.010(9), the definition of substantial remodel: "means a remodel of a residence, for which the total cost exceeds one-half of the assessed value of the residence for property tax purposes at the time the contract for the remodel work was made."
Source: RCW 64.50.010, Definitions, Washington State Legislature, read 22 October 2026.
- RCW 64.50.020(1), on the notice: "(1) In every construction defect action brought against a construction professional, the claimant shall, no later than 45 days before filing an action, serve written notice of claim on the construction professional." "(a) The notice of claim shall state that the claimant asserts a construction defect claim against the construction professional and shall describe the claim in reasonable detail sufficient to determine the general nature of the defect."
Source: RCW 64.50.020, Construction defect action, notice of claim, Washington State Legislature, read 22 October 2026.
- RCW 64.50.020(3)(a), one of the written responses the construction professional may give: "(a) Propose to inspect the residence that is the subject of the claim and to complete the inspection within a specified time frame. The proposal shall include the statement that the construction professional shall, based on the inspection, offer to remedy the defect, compromise by payment, or dispute the claim;"
Source: RCW 64.50.020, Construction defect action, notice of claim, Washington State Legislature, read 22 October 2026.
How do Arizona and other states address repair offers?
Notice first, then an opportunity to repair: A.R.S. 12-1363 says the purchaser shall give written notice to the seller before filing a dwelling action, and shall allow a reasonable opportunity to repair or replace when the seller's response includes a notice of intent to repair or replace. A.R.S. 12-1361 defines a dwelling action as one brought by a purchaser against the seller of a dwelling, and its definition of seller includes construction professionals. The texts are quoted below.
Source: Arizona Revised Statutes 12-1363, Notice and right to repair or replace, Arizona Legislature, read 22 October 2026.
Source: Arizona Revised Statutes 12-1361, Definitions, Arizona Legislature, read 22 October 2026.
- A.R.S. 12-1361, the definitions of dwelling action and of seller: "means any action involving a construction defect brought by a purchaser against the seller of a dwelling arising out of or related to the design, construction, condition or sale of the dwelling." and "means any person, firm, partnership, corporation, association or other organization that is engaged in the business of designing, constructing or selling dwellings, including construction professionals."
Source: Arizona Revised Statutes 12-1361, Definitions, Arizona Legislature, read 22 October 2026.
- A.R.S. 12-1363, subsection A, on the notice: "A. Before filing a dwelling action, the purchaser shall give written notice by certified mail, return receipt requested, to the seller specifying in reasonable detail the basis of the dwelling action."
Source: Arizona Revised Statutes 12-1363, Notice and right to repair or replace, Arizona Legislature, read 22 October 2026.
- Subsection D, if the seller does not answer: "D. If the seller does not provide a written response to the purchaser's notice within sixty days, the purchaser may file a dwelling action."
Source: Arizona Revised Statutes 12-1363, Notice and right to repair or replace, Arizona Legislature, read 22 October 2026.
- Subsection E, on the repair: "E. If the response provided pursuant to subsection C of this section includes a notice of intent to repair or replace the alleged construction defects, the purchaser shall allow the seller and the seller's construction professional a reasonable opportunity to repair or replace the alleged construction defects or cause the alleged construction defects to be repaired or replaced pursuant to the following:"
Source: Arizona Revised Statutes 12-1363, Notice and right to repair or replace, Arizona Legislature, read 22 October 2026.
- Subsection P, if you file first: "P. If the purchaser fails to comply with the requirements of this section before bringing a dwelling action, the dwelling action shall be dismissed."
Source: Arizona Revised Statutes 12-1363, Notice and right to repair or replace, Arizona Legislature, read 22 October 2026.
In our reading, none of the four laws quoted here forces you to say yes, but saying no has rules of its own. Florida's chapter 558 says a claimant must accept or reject a timely settlement offer within 45 days, and Texas's chapter 27 says a claimant who rejects a reasonable offer may not recover an amount in excess of the fair market value of the contractor's last offer of settlement. The texts are quoted below.
Source: Florida Statutes chapter 558, Construction Defects, Florida Legislature, read 22 October 2026.
Source: Texas Property Code chapter 27, Residential Construction Liability, Texas Legislature, read 22 October 2026.
- Florida, s. 558.004(7): "(7) A claimant who receives a timely settlement offer must accept or reject the offer by serving written notice of such acceptance or rejection on the person making the offer within 45 days after receiving the settlement offer."
Source: Florida Statutes chapter 558, Construction Defects, Florida Legislature, read 22 October 2026.
- Texas, s. 27.004(b), on an offer you think is unreasonable: "If a contractor makes a written offer of settlement that the claimant considers to be unreasonable:" "(1) on or before the 25th day after the date the claimant receives the offer, the claimant shall advise the contractor in writing and in reasonable detail of the reasons why the claimant considers the offer unreasonable;"
Source: Texas Property Code chapter 27, Residential Construction Liability, Texas Legislature, read 22 October 2026.
- Texas, s. 27.004(e), its first lines: "(e) If a claimant rejects a reasonable offer made under Subsection (b) or does not permit the contractor or independent contractor a reasonable opportunity to inspect or repair the defect pursuant to an accepted offer of settlement, the claimant:" "(1) may not recover an amount in excess of:" "(A) the fair market value of the contractor's last offer of settlement under Subsection (b);"
Source: Texas Property Code chapter 27, Residential Construction Liability, Texas Legislature, read 22 October 2026.
- Washington, RCW 64.50.020(4)(b): "(b) If the claimant rejects the inspection proposal or the settlement offer made by the construction professional pursuant to subsection (3) of this section, the claimant shall serve written notice of the claimant's rejection on the construction professional. After service of the rejection, the claimant may bring an action against the construction professional for the construction defect claim described in the notice of claim."
Source: RCW 64.50.020, Construction defect action, notice of claim, Washington State Legislature, read 22 October 2026.
- Arizona, A.R.S. 12-1363(C), on an offer of money instead of a repair: "The purchaser may accept or reject an offer of monetary compensation or other consideration, other than repair or replacement and, if rejected, may proceed with a dwelling action on completion of any repairs or replacements the seller and the seller's construction professional intend to make or provide."
Source: Arizona Revised Statutes 12-1363, Notice and right to repair or replace, Arizona Legislature, read 22 October 2026.
How do you prepare and send a defect notice?
Treat the notice as the first page of your case file: someone who has never seen the house should be able to find every defect from it alone. This page quotes only some states' laws, so read your own state's law and your contract before you rely on any deadline here. This is practical reasoning, not legal advice and not a finding from any agency.
- Read your contract for a clause on defect notices, repair rights, mediation or arbitration, and note any deadline it sets.
- Look up whether your state has its own construction defect notice law, and read the section itself rather than a summary of it.
- Photograph each defect with the date showing, and note where in the house it is, so each item can be found without a search.
- Write one numbered item per defect, with its location and what it is doing to the house now.
- Send the notice to the business you signed the contract with, in a way that gives you proof of delivery, and keep a copy.
- Mark the response dates on a calendar the day you send it, and keep every reply in the same file.
- Let the inspection happen at agreed times, and be there or have someone there to watch.
- Answer any repair or money offer in writing, by the date your state's law or your contract sets.
- If something is unsafe now, protect the house first. Florida's chapter 558, for example, says: "(9) This section does not prohibit or limit the claimant from making any necessary emergency repairs to the property as are required to protect the health, safety, and welfare of the claimant."
Source: Florida Statutes chapter 558, Construction Defects, Florida Legislature, read 22 October 2026.
- Talk to a lawyer in your state before you file, especially if a time limit for filing suit may be close.
Who sees your contact details when you post on InstaBids?
Contact details stay hidden until the homeowner picks a contractor and they confirm the connection.
Source: InstaBids process and privacy, live-page excerpts, read 22 October 2026.
Post your job on InstaBids, and contractors can bid in writing on one written scope.
Homeowners anywhere in the US can post a job; once you send it, InstaBids finds contractors to bid on it.
Start my requestSources for the facts on this page
- Florida Statutes chapter 558, Construction Defects, Florida Legislature, read 22 October 2026
- Texas Property Code chapter 27, Residential Construction Liability, Texas Legislature, read 22 October 2026
- RCW 64.50.010, Definitions, Washington State Legislature, read 22 October 2026
- RCW 64.50.020, Construction defect action, notice of claim, Washington State Legislature, read 22 October 2026
- Arizona Revised Statutes 12-1361, Definitions, Arizona Legislature, read 22 October 2026
- Arizona Revised Statutes 12-1363, Notice and right to repair or replace, Arizona Legislature, read 22 October 2026
- InstaBids process and privacy, live-page excerpts reviewed 22 October 2026.