InstaBidsInstaBids
Skip to content
InstaBids
Menu
Use your AIStart my request

What is a toe kick?

A toe kick is the recessed area at the bottom of a base or tall cabinet. It leaves room for your toes so you can stand closer to the counter.

InstaBids is an AI-run marketplace for homeowners and property managers: describe a home job once, by chat or through your own AI assistant, add photos, and get multiple written quotes on the same scope, compared apples to apples, with no phone calls or home visits before you pick.

By . Updated

InstaBids assistantAI · builds your written scope with you

What toe kick job do you need done in your home? Describe it once to start your written scope.

Start from a common job
You choose who gets your number
Or send it from your own AIChatGPTClaudeGrokGeminiMore ways
  1. Describe it onceBy chat, or through your own AI assistant, and add photos.
  2. Post it and send itContractors bid in writing on that scope.
  3. Compare line by lineEvery quote is written against the same scope.
  4. You chooseContact details stay hidden until you pick and they confirm.
InstaBids

For your AI assistant

MCP connector · REST API · plain HTML

Hand any of these to your assistant and it can help you write this job's request; you send the request yourself. What you type in the job box above goes into the prompt these buttons carry. The connector asks you to sign in to your InstaBids account the first time.

  • MCP connector URLhttps://instabids.ai/api/agent/mcp
  • Agent API (OpenAPI)https://instabids.ai/openapi.json
  • Start-request linkhttps://instabids.ai/intake?from=glossary-toe-kick&page_type=glossary&job=Repair+or+replace+cabinet+toe+kicks+in+my+home&utm_source=us&utm_medium=page&utm_campaign=glossary
Open it in your assistantAdd InstaBids as a connector

Every page is plain HTML. Steps for every assistant: add to your assistant.

What is the purpose of a toe kick?

The recess gives your toes room as you approach a counter. OSHA’s grocery-store ergonomics guide explains that toe space lets workers stand closer and can reduce reaching. This is guidance about standing at work counters, rather than a claim that every kitchen recess prevents injury. “Provide toe space to allow workers to stand closer to counters.” Source: Occupational Safety and Health Administration, read 2026-10-31. “This can reduce reaching.” Source: Occupational Safety and Health Administration, read 2026-10-31.

What is a toe kick in the woodwork standard?

The Architectural Woodwork Institute defines a toe kick by its position: the recess at the bottom of a base or tall cabinet. Its material standard distinguishes that recessed area from the support assembly beneath the cabinet. “Toe kicks are the recessed areas at the bottom of a base or tall cabinet.” Source: Architectural Woodwork Institute, read 2026-10-31.

What is the standard height of a toe kick?

There is no single height established for every home by these sources. For a concrete residential example, the NYC Department of Housing Preservation and Development’s casework specification describes a 4-inch-high toe kick. That dimension belongs to the cited specification; confirm the dimensions for your cabinet design. “Toe kick is 4 inches high and recessed 3-3/8 inches.” Source: NYC Department of Housing Preservation and Development, read 2026-10-31.

What is the depth of the toe kick?

The depth is the setback of the recess beneath the cabinet front. Hawaii’s State Laboratories Division specification uses 3 inches as its standard toe-kick depth, with adjustments where foot-controlled faucets are installed. This is a laboratory project requirement, not a national kitchen dimension. “Standard toe kick depth shall be 3 inches however Contractor shall make appropriate adjustments where foot-controlled faucets will be installed.” Source: Hawaii Department of Health, State Laboratories Division, read 2026-10-31.

Why Isn’t Cabinet Toe Kick Built In?

A toe-kick base can be part of the cabinet body or a separate component. The Architectural Woodwork Institute’s specialty casework standard expressly allows both constructions. A separate base therefore does not by itself mean a cabinet is missing a required built-in part. “Base/toe kick shall be integral (constructed as an integral part of the cabinet body) or separate (constructed as a separate component).” Source: Architectural Woodwork Institute, read 2026-10-31.

Sources

Start my requestUse your AI