InstaBidsInstaBids
Skip to content
InstaBids
Menu
Use your AIStart my request

Austin permit search

Austin building permit records are looked up in Austin Build + Connect (AB+C) Public Search, the City's online portal, with no log-in: open its Property tab and enter the street number and street name, or search by permit number. By default it looks back 365 days. Austin Development Services says: “A Building Permit (BP) is required to erect, construct, enlarge, alter, repair, improve, remove, convert, relocate, or demolish any building or structure within the City’s zoning jurisdiction.” Search permits in AB+C Public Search

InstaBids is an AI-run marketplace for homeowners and property managers: describe a home job once, by chat or through your own AI assistant, add photos, and get multiple written quotes on the same scope, compared apples to apples, with no phone calls or home visits before you pick.

Sources read: 2026-10-29Updated 2026-10-29

InstaBids assistantAI · builds your written scope with you

What home job do you need done in Austin, Texas? Describe it once to start your written scope.

Start from a common job
You choose who gets your number
Or send it from your own AIChatGPTClaudeGrokGeminiMore ways
  1. Describe it onceBy chat, or through your own AI assistant, and add photos.
  2. Post it and send itContractors bid in writing on that scope.
  3. Compare line by lineEvery quote is written against the same scope.
  4. You chooseContact details stay hidden until you pick and they confirm.
InstaBids

For your AI assistant

MCP connector · REST API · plain HTML

Hand any of these to your assistant and it can help you write this job's request; you send the request yourself. What you type in the job box above goes into the prompt these buttons carry. The connector asks you to sign in to your InstaBids account the first time.

  • MCP connector URLhttps://instabids.ai/api/agent/mcp
  • Agent API (OpenAPI)https://instabids.ai/openapi.json
  • Start-request linkhttps://instabids.ai/intake?from=permits-tx--travis--austin--building-permits&utm_source=permits&utm_medium=page&utm_campaign=permits-v3
Open it in your assistantAdd InstaBids as a connector

Every page is plain HTML. Steps for every assistant: add to your assistant.

Who issues building permits in Austin?

In the City of Austin, building permits come from Austin Development Services, a City department; other City departments issue permits such as special event and temporary use permits. The department describes its job:

Austin Development Services helps homeowners, business owners, and contractors ensure compliance with applicable City and building codes when they build, demolish, repair, or perform any construction in the City of Austin.

Source: Austin Development Services | City of Austin | AustinTexas.gov, read 2026-10-29

Austin permit numbers, with their sources

New privately-owned housing units authorized in 2025, Travis County (Census county total)15,059 units: 4,727 in one-unit buildings, 9,780 in buildings of five or more unitsCensus Bureau Building Permits Survey, annual county file 2025, Travis County, TX (county grain), read 2026-10-29
Residential Plan Review time for a fence application (review times starting July 1, 2026)5 business daysResidential Plan Review | Austin Development Services | AustinTexas.gov, City of Austin (authority grain), read 2026-10-29
Residential Plan Review time for new construction and additions10 business daysResidential Plan Review | Austin Development Services | AustinTexas.gov, City of Austin (authority grain), read 2026-10-29
Time to issue most Express Permits (minor repairs); it may differ in a floodplain or historic districtone business dayExpress Permits | Austin Development Services | AustinTexas.gov, City of Austin (authority grain), read 2026-10-29
When an activated permit expires if the City has done no on-site inspection180 days after activationActivating a Permit | Austin Development Services | AustinTexas.gov, City of Austin (authority grain), read 2026-10-29

Download this table: CSV · JSON

Austin permit status

A property owner can follow a project in AB+C Public Search: the status of the application under review, the permits generated from it and their inspections. Residential Plan Review says:

The status of your application can be checked online through the Austin Build +Connect (AB+C) Portal.

Source: Residential Plan Review | Austin Development Services | AustinTexas.gov, read 2026-10-29

The department's own link to the search: Austin Build + Connect (AB+C) Public Search.

Once a permit is active, the first inspection can be scheduled and construction can begin. A permit expires 180 days after activation if no on-site inspection has taken place; a passing inspection extends the expiration date by 180 days.

Do I need a permit for a fence in Austin?

The City's fencing page names the cases in which a fence requires a permit:

Source: Fencing Regulations | Austin Development Services | AustinTexas.gov, read 2026-10-29

A fence that needs no permit still has to follow the rules on that page, which cites City Code 25-2-899. The time listed for a fence application is 5 business days.

Start my request for a fence in Austin

Do I need a permit to repair or replace a roof in Austin?

The City's list of work exempt from building permits names these roof jobs:

Source: Work Exempt from Building Permits | Austin Development Services | AustinTexas.gov, read 2026-10-29

Roof decking up to 128 square feet is on the same list. Repairs that replace decking boards over an area greater than 128 sq. ft., or replace over 50% of the roofing on a property in the Wildland-Urban Interface Code Area, go through a Residential Express Building Permit (Minor Repairs); most Express Permits are issued in one business day, though the time may differ in a floodplain or historic district.

Start my request for a roof repair or replacement in Austin

Do I need a permit to replace a water heater or AC unit in Austin?

Replacing water heating, heating or cooling appliances in an occupied home is filed as a Change Out permit in the AB+C portal. The AB+C Manual's qualifications include:

Source: AB+C Manual | Austin Transportation and Public Works | AustinTexas.gov, read 2026-10-29

Start my request for a water heater or HVAC change-out in Austin

Do I need a permit for a deck in Austin?

A small, low deck that is not attached to the house is on the exempt list, and so is a repair limited to the existing deck boards:

Source: Work Exempt from Building Permits | Austin Development Services | AustinTexas.gov, read 2026-10-29

An uncovered deck that needs a permit is filed as a Pool and/or Uncovered Deck Building Permit; the time listed for that application is 5 business days.

Start my request for a deck in Austin

Can a homeowner pull their own permit in Austin?

Yes. A homeowner can register as the general contractor on the building permit, and then requests and activates it, pays for it and schedules its inspections, including the final one. The Homeowner's Permit page:

As a homeowner, you can register as a contractor and be responsible for requesting/activating permits and scheduling/passing inspections for your property.

Source: Homeowner's Permit | Austin Development Services | AustinTexas.gov, read 2026-10-29

Plumbing, electrical or mechanical work done by the owner is a separate step, the Homestead Permit. Its conditions include a homestead exemption filed with the county tax appraisal district, work in the owner's own homestead and principal residence, no work on the main electric service, refrigerant charging or liquefied petroleum systems, and no homestead permit for another residence within the prior 12-month period. The page sums it up:

By qualifying for a Homestead Permit, you act as the trade contractor. These permits are not transferable.

Source: Homeowner's Permit | Austin Development Services | AustinTexas.gov, read 2026-10-29

What work does not need a permit in Austin?

The City publishes a list of work exempt from building permits; its residential part covers one- and two-family dwellings and townhouses not more than three stories. Exempt work still has to meet the codes:

A building permit is not required for the work described below; however, work exempt from a permit must still comply with applicable Building Codes, City Codes, and all other applicable ordinances.

Source: Work Exempt from Building Permits | Austin Development Services | AustinTexas.gov, read 2026-10-29

Residential items on the list include:

Source: Work Exempt from Building Permits | Austin Development Services | AustinTexas.gov, read 2026-10-29

A new or replacement shower, tub or combination tub and shower is not exempt (Section 104.2). The full list, with mechanical and electrical items: Work Exempt from Building Permits.

How much is a permit and how long does it take in Austin?

Austin residential permit fees (City fee schedule, Effective 10/01/2026)

Lines from the City's Residential Building Plan Review & Inspection Permit Fees schedule (updated 10/14/2026); the schedule says permit fees include one inspection per required inspection type. These are government permit fees, not a price for the work itself. The full schedule: Residential Plan Review Fee Schedule.

Express Residential Plan Review $112.76

Source: Residential Building Plan Review & Inspection Permit Fees, read 2026-10-29

Residential Express Permits/Kitchen Remodels - Inspection $72.96

Source: Residential Building Plan Review & Inspection Permit Fees, read 2026-10-29

Small Projects Plan Review (Garage Conversions and Carport/Porch enclosures, Amnesty CO, Fences, Pools) S $146.15

Source: Residential Building Plan Review & Inspection Permit Fees, read 2026-10-29

Additional Small Project S $146.15 N/A

Source: Residential Building Plan Review & Inspection Permit Fees, read 2026-10-29

Residential Change - Out Program Permits - HVAC (first system) $74.05

Source: Residential Building Plan Review & Inspection Permit Fees, read 2026-10-29

Includes: Water Heaters, replacement of backflow devices, irrigation systems, water yard lines and sewer yard lines

Source: Residential Building Plan Review & Inspection Permit Fees, read 2026-10-29

Residential Plan Review lists review times starting July 1, 2026: 5 business days for fence, interior remodel and swimming pool or uncovered deck applications, 10 business days for new construction and additions, and typically same day for Express. The review time starts once the invoice is paid.

Before you apply in Austin: checklist

Search the property in Public Search for expired permits, and file the Acknowledgment of Expired Permits with the application if it has any. Download the application and review its checklists, then apply with the matching Residential Building Permit web form; an invoice follows once the application is accepted for review. For an Express Permit, give the general contractor's AB+C Portal account email and Contractor PIN so the permit activates on payment. Once it is active, the permit is posted at the property:

The permit must be displayed on the property's entrance side, visible from the public right-of-way (i.e., the street).

Source: Activating a Permit | Austin Development Services | AustinTexas.gov, read 2026-10-29

Austin permit application

Express applications are submitted online through web forms, and some permit types can be applied for in the AB+C portal itself. Whoever is listed on the permit needs an AB+C Portal account:

The contractor listed on the permit (general contractor, trades contractor, or homeowner) must have an AB+C Portal account to pay fees, manage the permit, and schedule inspections.

Source: Express Permits | Austin Development Services | AustinTexas.gov, read 2026-10-29

Not sure a project needs a permit? The City's interactive tool asks about the jurisdiction, property type and permitting needs: Do I Need a Permit?.

How do I contact the Austin building department?

Austin Development Services runs the Permitting and Development Center (PDC), which offers virtual or in-person appointments and some walk-in appointment types, though not for every service: Appointments webpage. The department's contact page: Contact. Its note on chat and phone hours:

Staff from select work groups are available to chat via the web during regular business hours, 8 a.m. - 4 p.m., Monday through Thursday. On Fridays, staff will be unavailable for online chat and phone inquiries.

Source: Contact Austin Development Services | Austin Development Services | AustinTexas.gov, read 2026-10-29

Sources

Start my requestUse your AI