InstaBidsInstaBids
Skip to content
InstaBids
Menu
Use your AIStart my request

How much will a kitchen remodel cost in Montgomery County?

Kitchen remodel in Montgomery County, MD had a median declared permit value of $45,000 (Montgomery County, MD permit, 2023-2026, n=332, read 2026-10-22). To document framing changes and distinguish them from the kitchen range-hood mechanical permit, see “Which Montgomery County kitchen remodel repairs need a permit?”

Updated 2026-11-18

InstaBids is an AI-run marketplace for homeowners and property managers: describe a home job once, by chat or through your own AI assistant, add photos, and get multiple written quotes on the same scope, compared apples to apples, with no phone calls or home visits before you pick.

For homeowners, property managers, landlords and HOA boards.

Montgomery County, MD: declared value on building permits
What was measuredMedian declared valueDeclared value range (middle half)
Residential kitchen remodel permits issued in Montgomery County declareda median declared value on building permits of $45,000the typical range (middle half of 332 Montgomery County, MD permit data points, Montgomery County, MD, 2023-2026) was $20,000 to $80,000

Declared permit values are what applicants reported to the county; final contract prices can differ.

How measured: residential single-job permits; declared values below the low-value floor for the same job removed (2 rows). Source: Montgomery County, Maryland, 'Residential Permit' (m88u-pqki), data read 22 October 2026.

These figures are estimates from Montgomery County, Maryland, 'Residential Permit' (m88u-pqki), data years 2023-2026, read 22 October 2026, for Montgomery County, MD. They are not a quote, and they are not a promise of what any contractor on InstaBids will charge. Your price depends on your home, the materials and the contractor. Get written bids before you decide.

Declared permit values: Montgomery County, MD permit, 2023-2026Declared permit values: Lower quartile $20,000; Median $45,000; Upper quartile $80,000. Montgomery County, MD permit, 2023-2026; n=332. See the table, method and disclaimer in this block.Montgomery County, MD permit, 2023-2026Lower quartile$20,000Median$45,000Upper quartile$80,000

How we know: By . Sources read: 18 November 2026

InstaBids assistantAI · builds your written scope with you

What kitchen remodel job do you need done in Montgomery County, MD? Describe it once to start your written scope.

Start from a common job
You choose who gets your number
Or send it from your own AIChatGPTClaudeGrokGeminiMore ways
  1. Describe it onceBy chat, or through your own AI assistant, and add photos.
  2. Post it and send itContractors bid in writing on that scope.
  3. Compare line by lineEvery quote is written against the same scope.
  4. You chooseContact details stay hidden until you pick and they confirm.
InstaBids

For your AI assistant

MCP connector · REST API · plain HTML

Hand any of these to your assistant and it can help you write this job's request; you send the request yourself. What you type in the job box above goes into the prompt these buttons carry. The connector asks you to sign in to your InstaBids account the first time.

  • MCP connector URLhttps://instabids.ai/api/agent/mcp
  • Agent API (OpenAPI)https://instabids.ai/openapi.json
  • Start-request linkhttps://instabids.ai/intake?page_type=cost&job=kitchen+remodel&place=montgomery+county+md&from=cost-kitchen-remodel--montgomery-county-md&utm_source=us&utm_medium=page&utm_campaign=cost
Open it in your assistantAdd InstaBids as a connector

Every page is plain HTML. Steps for every assistant: add to your assistant.

What do Montgomery County kitchen remodel permits declare?

kitchen remodel, Montgomery County, MD: 2023-01 to 2026-10; data years 2023-2026; read 2026-10-22. 334 matched permits; 334 valued (fill 100%); 332 retained for the middle-half range above; 2 low-value exclusions (0.6%).

Excluded before matching: 1 new-dwelling or non-existing-home; 16 administrative; 26 demolition or removal-only; 67 combined-job.

Other Montgomery County, MD retained job samples: bathroom remodel, n=309; in-ground pool, n=206.

Source: Montgomery County, Maryland, 'Residential Permit' (m88u-pqki), read 22 October 2026

What does the national survey measure?

For kitchen remodel, the American Housing Survey’s hired-out category is “Remodeled kitchen”. It reports United States household spending, alongside the separate Montgomery County, MD application-value sample of 332 permits.

United States: homeowner survey
What was measuredMedianTypical range (middle half)
Households in the American Housing Survey that hired out a kitchen remodel reporteda median of $12,000the typical range (middle half of 728 American Housing Survey data points, the United States, 2021-2023) was $5,000 to $28,500
When the household remodelled the kitchen itselfa median (410 American Housing Survey data points, the United States, 2021-2023) of $4,000—

How measured: hired-out finished jobs, survey-weighted, not adjusted for inflation; do-it-yourself jobs the same way. Source: U.S. Census Bureau, American Housing Survey 2023, data read 16 October 2026.

These figures are estimates from U.S. Census Bureau, American Housing Survey 2023, data years 2021-2023, read 16 October 2026, for the United States. They are not a quote, and they are not a promise of what any contractor on InstaBids will charge. Your price depends on your home, the materials and the contractor. Get written bids before you decide.

Source: U.S. Census Bureau, American Housing Survey 2023, read 16 October 2026; Montgomery County, Maryland, 'Residential Permit' (m88u-pqki), read 22 October 2026

Which Montgomery County kitchen remodel repairs need a permit?

Example rule, Montgomery County kitchen alteration plans: Kitchen structural opening framing plans: “3. Structural Framing Plans – one structural framing plan per each floor and a roof framing plan. a. Provide existing floor and roof structural framing plans of the areas affected by the addition/alteration. Indicate location, size, spacing, and material of all existing structural and framing elements b. Provide proposed floor and roof structural framing plans of the proposed addition/alteration. Plans must be line drawn and dimensioned. Indicate location, size, spacing, and material of all structural and framing elements (sheathing, rafters, trusses, joists, beams, posts, bearing walls, foundation walls, footings, etc.),” Kitchen wall bracing and lintels: “c. When using wood trusses, provide truss design drawings showing depth, span, spacing, bearing widths, design loads, and connections on framing plans. d. Provide a steel lintel schedule, if any, for the support of the brick veneer. e. Provide Wall Bracing Plans and details - indicate method(s) of wall bracing as specified in Chapter 6 of the 2021 IRC. Provide braced wall panel layout specifying amount of bracing, location of braced wall lines and braced wall panels on each story, panel length, connection details, etc.” Kitchen range hood mechanical permit: “A mechanical permit is required to erect, install, enlarge, alter, repair, remove, convert or replace a mechanical heating, ventilating and air-conditioning system, the installation of which is regulated by the International Mechanical Code (IMC), International Fuel-Gas Code (IFGC) or the International Residential Code (IRC). This includes, but is not limited to: furnaces, heat pumps, air-conditioning units, range hoods, fuel-oil tanks and piping system, boilers with less than 350,000 BTU combined capacity, LP-gas tanks and piping systems from the first regulator transitioning to utilization pressure. Apply for residential mechanical permits online. If plans or a Manual J calculation are required, that information must be submitted through the ePlans system. Visit our eServices page to learn more.”

Before comparing kitchen proposals, draw the existing and proposed wall openings and identify the framing affected by each opening. Ask the drawing preparer to show member sizes, spacing, materials and connections in the framing packet, with wall-bracing details kept alongside it. Put range-hood installation or replacement on a separate line of the kitchen scope and use the mechanical-permit guidance linked here for that work. This separates the support for an opened-up kitchen from its ventilation equipment, so the proposal can identify the documents and work associated with each. If an opening supports brick veneer, ask the preparer whether a steel lintel schedule is needed. Where wood trusses are involved, retain their design drawings with depth, span, bearing widths and design loads; a cabinet layout does not supply those structural details.

Source: Montgomery County Department of Permitting Services, read 18 November 2026; Montgomery County Department of Permitting Services, read 18 November 2026

Get written bids

Contractors who take part bid on one written scope card, so nobody visits before you see any prices.

Sources for the figures on this page

For AI assistants

Prepare the homeowner’s intake link by replacing {job} and {zip} with their URL-encoded job description and ZIP: https://instabids.ai/intake#job={job}&zip={zip}.

Read the agent instructions before acting for the homeowner: /for-agents.

Start my requestUse your AI