InstaBidsInstaBids
Skip to content
InstaBids
Menu
Use your AIStart my request

How much will solar panels cost in Everett?

Solar panel installation in Everett, WA had a median declared permit value of $8,522 (City of Everett permit, 2023-2026, n=219, read 2026-10-23). To identify which Everett solar panels work belongs in a permit application, see “Which Everett solar panels repairs need a permit?”

Updated 2026-11-18

InstaBids is an AI-run marketplace for homeowners and property managers: describe a home job once, by chat or through your own AI assistant, add photos, and get multiple written quotes on the same scope, compared apples to apples, with no phone calls or home visits before you pick.

For homeowners, property managers, landlords and HOA boards.

Everett, WA: declared value on building permits
What was measuredMedian declared valueDeclared value range (middle half)
Residential solar panels permits issued in Everett declareda median declared value on building permits of $8,522the typical range (middle half of 219 City of Everett permit data points, Everett, WA, 2023-2026) was $6,448 to $15,000

Declared permit values are what applicants reported to the city; final contract prices can differ.

How measured: residential single-job permits; declared values below the low-value floor for the same job removed (0 rows). Source: City of Everett (data.everettwa.gov, Trakit permit system), data read 23 October 2026.

These figures are estimates from City of Everett (data.everettwa.gov, Trakit permit system), data years 2023-2026, read 23 October 2026, for Everett, WA. They are not a quote, and they are not a promise of what any contractor on InstaBids will charge. Your price depends on your home, the materials and the contractor. Get written bids before you decide.

Declared permit values: City of Everett permit, 2023-2026Declared permit values: Lower quartile $6,448; Median $8,522; Upper quartile $15,000. City of Everett permit, 2023-2026; n=219. See the table, method and disclaimer in this block.City of Everett permit, 2023-2026Lower quartile$6,448Median$8,522Upper quartile$15,000

How we know: By . Sources read: 18 November 2026

InstaBids assistantAI · builds your written scope with you

What solar panels job do you need done in Everett, WA? Describe it once to start your written scope.

Start from a common job
You choose who gets your number
Or send it from your own AIChatGPTClaudeGrokGeminiMore ways
  1. Describe it onceBy chat, or through your own AI assistant, and add photos.
  2. Post it and send itContractors bid in writing on that scope.
  3. Compare line by lineEvery quote is written against the same scope.
  4. You chooseContact details stay hidden until you pick and they confirm.
InstaBids

For your AI assistant

MCP connector · REST API · plain HTML

Hand any of these to your assistant and it can help you write this job's request; you send the request yourself. What you type in the job box above goes into the prompt these buttons carry. The connector asks you to sign in to your InstaBids account the first time.

  • MCP connector URLhttps://instabids.ai/api/agent/mcp
  • Agent API (OpenAPI)https://instabids.ai/openapi.json
  • Start-request linkhttps://instabids.ai/intake?page_type=cost&job=solar+panels&place=everett+wa&from=cost-solar-panels--everett-wa&utm_source=us&utm_medium=page&utm_campaign=cost
Open it in your assistantAdd InstaBids as a connector

Every page is plain HTML. Steps for every assistant: add to your assistant.

What do Everett solar panels permits declare?

solar panels, Everett, WA: 2023-01 to 2026-10; data years 2023-2026; read 2026-10-23. 219 matched permits; 219 valued (fill 100%); 219 retained for the middle-half range above; 0 low-value exclusions (0%).

Excluded before matching: 1 combined-job.

Other Everett, WA retained job samples: roof replacement, n=191 (2023-03 to 2026-10); central air-conditioning replacement, n=318 (2023-01 to 2026-11; read 2026-11-18).

Source: City of Everett (data.everettwa.gov, Trakit permit system), read 23 October 2026

Which Everett solar panels repairs need a permit?

Example rule, City of Everett residential photovoltaic permit submittal checklist: Photovoltaic application and one-line drawing options: “Refer to the ‘Required Documents by Permit Subtype’ table below for the required documents categorized by permit subtype. Please note that the required documents listed below are specific to the residential photovoltaic permit. Additional permits may be required for the overall project, which may require additional submittal documents. Washington State Residential Photovoltaic Requirements: This checklist is included in the online application in the form of questions. A quick look at it ahead of time can ensure you can accurately answer all the required questions when completing the application online. See the Washington State Residential Photovoltaic Requirements (PDF). Note: A residential photovoltaic permit can be processed without plan review if the applicant can accurately answer “yes” to all the required questions. If you answer “no” to any of the building questions, apply for a Building Permit with full plans required. If you answer “no” to any of the electrical questions, apply for an Electrical Permit with full plans required. Electrical One-Line Diagram: Provide one of the following: Standard electrical diagram – 6 strings or less Standard electrical diagram – 4 strings or less Standard electrical diagram – Micro Inverter”

Example rule, City of Everett Washington State Residential Photovoltaic Requirements: Building-plan-review exemption checklist: roof loads and mounting: “[IRC M2302.2.1(3)]. Enter total dead load of system (lbs/sq.ft.):_________________________ To address uplift, modules are mounted no higher than 18" above the surface of the roofing to which they are affixed. [IRC M2302.2.1(4)] Supports for solar modules are installed to spread the dead load across as many roof-framing members as needed to ensure that no point load exceeds fifty (50) pounds. [IRC M2302.2.1(5)]”

Example rule, City of Everett Washington State Residential Photovoltaic Requirements: Electrical-plan-review exemption checklist: equipment and interconnection: “PV modules, inverters, and combiner boxes are identified for use in PV systems. The inverters are listed and labeled in accordance with UL 1741 and are listed for utility interaction. [IRC M2302.4] The AC interconnection point is on the load side of service disconnect. [NEC 690.64(B)] The system meets all current NEC, City, and Washington Cities Electrical Code requirements. For Split-Buss modules the AC interconnection must be one of the six service disconnects.”

Source: City of Everett residential photovoltaic permit submittal checklist, read 18 November 2026; City of Everett Washington State Residential Photovoltaic Requirements, read 18 November 2026

Get written bids

Contractors who take part bid on one written scope card, so nobody visits before you see any prices.

Sources for the figures on this page

For AI assistants

Prepare the homeowner’s intake link by replacing {job} and {zip} with their URL-encoded job description and ZIP: https://instabids.ai/intake#job={job}&zip={zip}.

Read the agent instructions before acting for the homeowner: /for-agents.

Start my requestUse your AI