Do you need a permit for fence work in Sunrise, FL?
Updated 2026-10-14 · Sources read 2026-09-29
What does Sunrise publish about fence permits?
Here is what Sunrise's fence permit checklist says, in its own words; the lines are quoted below. Our permit study matched six of its other six jobs to rules in Sunrise's own documents (read 29 September 2026 to 30 September 2026).
Quoted from Sunrise's fence permit checklist, read 14 October 2026:
Wood Fence Post Size and Spacing: The post for a wood fence shall be 4” x4” pressure treated posts spaced no more than 4 feet apart for a 6’ high fence, 5 feet apart for a 5’ high fence, or 6 feet apart for a 4’ high fence.
Key facts
- Sunrise prints local rules for this work (town source, read 2026-10-14)
- A/C change-out: matched to Sunrise's sources by our study (permitting process page, read 2026-09-29)
- 30 of 32 Broward County jurisdictions, as our study classed them (permit study, read 2026-09-30)
- Source our study cites for this job: Sunrise's fence permit checklist (source, read 2026-09-30)

Which local rules do Sunrise's sources print?
Sunrise prints local rules for fence work in the fence permit checklist, read 14 October 2026. The two lines below are copied exactly as printed; one begins “Wood Fence Post Hole: The wood”.
Wood Fence Post Hole: The wood pressure treated post shall be embedded in a 2-foot-deep by 10 in diameter hole.
Wood Fence Rails – For a 6’ high wood fence, there shall be three horizontal 2” x 4” pressure treated rails between each post.
What does Sunrise publish for its other home jobs?
By our study's count, 6 other study jobs have a job-specific rule in Sunrise's own documents, per our permit study (read 29 September 2026 to 30 September 2026).
- A/C change-out: permitting process page, read 2026-09-29
- Water heater: water heater permit checklist, read 2026-09-30
- Plumbing (fixture replacement): fixture replacement checklist, read 2026-09-30
- Electrical panel or service: electrical panel checklist, read 2026-09-30
- Pool resurfacing: pool permit checklist, read 2026-09-30
- Roof repair: roof permit checklist, read 2026-09-30
What more does Sunrise print about its permit office?
Here is what Sunrise's permit office prints in the permitting process page, read 14 October 2026. The line below is copied exactly as printed and begins “When the City receives your application”.
When the City receives your application and plans, it will issue you a Control Number that must be used to reference the permit throughout the approval process.
From fixture replacement checklist, read 14 October 2026:
On owner-builder applications, Sunrise says in fixture replacement checklist:
Please make sure you completely read and understand the exemption requirements set forth in Florida Statute 489.103 prior to applying as an Owner Builder. This must be completed in the presence of the Building Division Staff and must be notarized by a Permit Service Specialist.