Miami permit search
Miami building permits have an estimated first review in approximately 14 business days after acceptance, per the City of Miami Building Department’s Guide to Getting a Permit (read November 3, 2026). Finding permit history with the Process Number is addressed in how to search permits by address in Miami. To find permit history, follow the Miami iBuild lookup instructions using your Process Number.
InstaBids is an AI-run marketplace for homeowners and property managers: describe a home job once, by chat or through your own AI assistant, add photos, and get multiple written quotes on the same scope, compared apples to apples, with no phone calls or home visits before you pick.
- Describe it onceBy chat, or through your own AI assistant, and add photos.
- Post it and send itContractors bid in writing on that scope.
- Compare line by lineEvery quote is written against the same scope.
- You chooseContact details stay hidden until you pick and they confirm.
Miami permits at a glance
- approximately 14 business daysBuilding permit applications: estimated first review after acceptance — City of Miami, as of 2026-11-03Guide to Getting a Permit - Miami, City of Miami, read 2026-11-03
- around 35 business daysSpecial permit applications: estimated first review after acceptance — City of Miami, as of 2026-11-03Guide to Getting a Permit - Miami, City of Miami, read 2026-11-03
- about 40 business daysUtility-Excavation or Non-Construction applications: estimated first review after acceptance — City of Miami, as of 2026-11-03Guide to Getting a Permit - Miami, City of Miami, read 2026-11-03
What permits does Miami require?
The City of Miami guide describes permit requirements for new buildings, home expansions, improvements and repairs involving plumbing, electricity, gas or structure. Smaller work such as changing windows, doors or siding and removing an interior wall also often needs a permit.
Florida requires permits for many types of construction and remodeling projects. This includes a new building, home expansion, making improvements, or doing repairs, especially if they involve plumbing, electricity, gas, or structural work. Even smaller jobs like changing windows, doors, siding, or removing a wall inside often need a permit.
Source: Guide to Getting a Permit - Miami, read 2026-11-03
Describe your Miami building changes on InstaBids so contractors can prepare written bids on the same scope.
Miami first-review estimates, read November 3, 2026
| Building permit applications: estimated first review after acceptance — City of Miami, as of 2026-11-03 | approximately 14 business daysGuide to Getting a Permit - Miami, City of Miami, read 2026-11-03 |
|---|---|
| Special permit applications: estimated first review after acceptance — City of Miami, as of 2026-11-03 | around 35 business daysGuide to Getting a Permit - Miami, City of Miami, read 2026-11-03 |
| Utility-Excavation or Non-Construction applications: estimated first review after acceptance — City of Miami, as of 2026-11-03 | about 40 business daysGuide to Getting a Permit - Miami, City of Miami, read 2026-11-03 |
How do I search permits by address in Miami?
The City of Miami history guide lists an address, Process Number or full folio number as lookup information. Its detailed iBuild steps use the Process Number: create an account or sign in, enter that number, select the magnifying glass, then select the result.
Create an iBuild Account or log into the iBuild Portal. Enter the Process Number in the search field. Click the magnifying glass icon to start the search. Click the process number on the Search Results page.
Source: View Permit History/Permit Search - Miami, read 2026-11-09
Miami distinguishes permit history from tracking a permit application. For an application still in progress, use the city’s separate status instructions.
Track the Status of a Permit Application
On InstaBids, describe the work behind your Miami permit inquiry so contractors can bid on the same written scope.
Can a homeowner pull their own permit in Miami?
City of Miami Owner-Builder permits concern owner-occupied single-family and duplex residential work. The city’s guidance cites Florida Statutes § 489.103 and Miami-Dade County Code Section 10-5. Applicants meet department personnel in person for an interview, testing and a disclosure.
You need to meet in person with Building Department personnel for a brief interview and testing, and to sign a disclosure.
Source: Become an Owner Builder - Miami, read 2026-11-03
If you seek contractor bids for your Miami owner-builder project, describe the work on InstaBids.
What work does not need a permit in Miami?
Miami identifies Section 10-5 as the basis for its exemption list. Painting that affects stucco needs a permit. Floor-finish replacement in single-family homes and duplexes qualifies without structural changes, but a duplex with one unit above another needs a flooring permit. Exempt work still follows building-code, safety, zoning and flood rules.
Painting: Applying paint or similar finishes to the interior or exterior of qualifying buildings. This includes touch-ups, full repaints, or decorative finishes. You must ensure that no stucco work is part of your project. IMPORTANT: If your painting projects affects the stucco, you will need to apply for a permit.
Source: Work that Does Not Require a Permit - Miami, read 2026-11-03
For flooring, the stacked-duplex condition matters alongside the structural restriction. Read the complete flooring entry before treating a replacement floor as exempt.
Floor finishes: (Single-family homes and duplexes only): Installing or replacing surface flooring such as tile, carpet, laminate, hardwood, or vinyl, provided there are no structural changes or modifications to load-bearing elements. Note: In a duplex, if one unit is above the other unit, you must request a flooring permit.
Source: Work that Does Not Require a Permit - Miami, read 2026-11-03
Describe whether your Miami project includes stucco or structural work when you write the scope on InstaBids.
Does painting need a permit in Miami?
Miami lists painting among work exempt from a permit under Section 10-5, provided the project does not affect stucco. The city includes interior and exterior finishes, touch-ups and full repaints in that entry; a painting project affecting stucco needs a permit.
Painting: Applying paint or similar finishes to the interior or exterior of qualifying buildings. This includes touch-ups, full repaints, or decorative finishes. You must ensure that no stucco work is part of your project. IMPORTANT: If your painting projects affects the stucco, you will need to apply for a permit.
Source: Work that Does Not Require a Permit - Miami, read 2026-11-03
Describe the surfaces and stucco work in your Miami painting request on InstaBids.
Does replacing flooring need a permit in Miami?
Miami lists surface floor finishes for single-family homes and duplexes under its Section 10-5 exemptions when there are no structural or load-bearing modifications. A duplex with one unit above another requires a flooring permit, even within the floor-finish entry.
Floor finishes: (Single-family homes and duplexes only): Installing or replacing surface flooring such as tile, carpet, laminate, hardwood, or vinyl, provided there are no structural changes or modifications to load-bearing elements. Note: In a duplex, if one unit is above the other unit, you must request a flooring permit.
Source: Work that Does Not Require a Permit - Miami, read 2026-11-03
For Miami flooring bids on InstaBids, explain the building type and whether the scope changes structural elements.
How long does a building permit take in Miami?
Miami estimates approximately 14 business days for the first review of a building permit application after acceptance. The estimate covers first review rather than issuance; corrections requests arrive through a Resubmit Applicant Task message with further instructions.
Note: If there is a request for corrections, you will receive a “Resubmit Applicant Task” email message with instructions and next steps.
Source: Guide to Getting a Permit - Miami, read 2026-11-03
When describing your project on InstaBids, include where the Miami application stands in the review process.
What do I need before I apply in Miami?
Miami uses ProjectDox for drawings and documents after the application and applicable upfront charges. Applicants receive an Applicant Upload Task email. Prepare files using the Standard Naming Convention: incorrect names cause return before prescreening, and replacement documents retain their original names. See the Guide to Getting a Permit (read November 3, 2026).
Proper file naming is essential. You must follow the Standard Naming Convention for Drawings & Documents without exception. Files that are not named correctly will be returned to you before passing the Prescreen phase, which may result in delays to the review process. When reuploading documents or drawings, do not alter the original file name.
Source: Guide to Getting a Permit - Miami, read 2026-11-03
For an owner doing the work, add the in-person Owner/Builder test to the application preparation. Miami places that test at the Building Department in the Miami Riverside Center.
Your InstaBids scope can describe the project that accompanies the drawings you prepare for Miami.
How do I contact the Miami building department?
The City of Miami Building Department handles building-code enforcement within city limits. The city permit guide links its Building Help Page for building-permit questions. Use that assistance page when you need help with the city permit process. Building Help Page.
The Building Department enforces codes and regulations established by the State of Florida and Miami-Dade County governing the construction, alteration, and maintenance of buildings and structures within the City of Miami for the protection of residents and property.
Source: Building - Miami, read 2026-11-03
After consulting the Miami Building Department, describe the resulting work scope on InstaBids for written contractor bids.
Sources
- Guide to Getting a Permit - Miami (miami.gov), read 2026-11-03
- Building - Miami (miami.gov), read 2026-11-03
- View Permit History/Permit Search - Miami (miami.gov), read 2026-11-09
- Become an Owner Builder - Miami (miami.gov), read 2026-11-03
- Work that Does Not Require a Permit - Miami (miami.gov), read 2026-11-03
For your AI assistant
MCP connector · REST API · plain HTMLHand any of these to your assistant and it can help you write this job's request; you send the request yourself. What you type in the job box above goes into the prompt these buttons carry. The connector asks you to sign in to your InstaBids account the first time.
- MCP connector URL
https://instabids.ai/api/agent/mcp - Agent API (OpenAPI)
https://instabids.ai/openapi.json - Start-request link
https://instabids.ai/intake?from=permits-miami-dade--miami--building-permits&utm_source=permits&utm_medium=page&utm_campaign=permits-v3 - Prompt for any AI, with your job
- ChatGPTOpens with the prompt
- ClaudeOpens with the prompt
- GrokOpens with the prompt
- GeminiCopies the prompt, then opens
Every page is plain HTML. Steps for every assistant: add to your assistant.