InstaBidsInstaBids
Skip to content
InstaBids
Menu
Use your AIStart my request

St. Petersburg permit search

St. Petersburg building permits go through the Construction Services and Permitting Division; its Building Permits (read November 3, 2026) guidance directs homeowners to obtain required permits before work starts. To look up your application, follow the permit search steps and use Click2Gov’s application-number, address or parcel search. The city says: “Get required permits before you or your contractor start repair, improvement, or construction on your home”. Search permits on Click2Gov

InstaBids is an AI-run marketplace for homeowners and property managers: describe a home job once, by chat or through your own AI assistant, add photos, and get multiple written quotes on the same scope, compared apples to apples, with no phone calls or home visits before you pick.

  1. Describe it onceBy chat, or through your own AI assistant, and add photos.
  2. Post it and send itContractors bid in writing on that scope.
  3. Compare line by lineEvery quote is written against the same scope.
  4. You chooseContact details stay hidden until you pick and they confirm.

St. Petersburg permits at a glance

  • 10 business days; denial and workflow termination if not corrected; contact ePlan staff to reactivate.Initial electronic-submittal corrections — St. Petersburg, read 2026-11-03Building Permits, St. Petersburg, read 2026-11-03
  • At least 7 business days before the meeting; drawings emailed as PDF.Drawings for optional preliminary plan review — St. Petersburg, read 2026-11-03Building Permits, St. Petersburg, read 2026-11-03
  • Past 10 years; a user account is required for contractor history.Contractor history in Click2Gov — St. Petersburg, read 2026-11-03Click2Gov Building Permit, St. Petersburg, read 2026-11-03

By . Sources read: 2026-11-03Updated 2026-11-03

How do I search permits by address in St. Petersburg?

St. Petersburg’s Click2Gov form offers Address, Application Number and Parcel Number as search methods. For an address search, enter the building or house number in Street Number. Address searches are not case sensitive.

Type the building or house number into the Street Number field.

Source: Click2Gov Building Permit - Select Permit, read 2026-11-03

Addresses are not case sensitive

Source: Click2Gov Building Permit - Select Permit, read 2026-11-03

Source: Select Permit; read 2026-11-03.

When planning work at a St. Petersburg property, you can describe the project on InstaBids and request written bids.

How do I check my permit status in St. Petersburg?

St. Petersburg directs applicants to Select Permit, then to enter the application number and open plan tracking status for individual trade review status. Click2Gov also allows inspection results and permit history to be viewed without creating an account.

Click “select permit” on the left navigation menu and enter application # Click “plan tracking status” and review individual trade review status

Source: Building Permits, read 2026-11-03

Source: Building Permits; read 2026-11-03.

For a St. Petersburg project you are tracking, InstaBids lets you post the work and compare written bids.

Can a homeowner pull their own permit in St. Petersburg?

St. Petersburg’s homeowner guidance directs residents filing permits for repairs or improvements to the main permitting office at the Municipal Services Center. The general permit rule names an owner or authorized agent as the applicant for regulated work.

Get required permits before you or your contractor start repair, improvement, or construction on your home

Source: Building Permits, read 2026-11-03

Source: Building Permits, read 2026-11-03.

If you are arranging repairs to your St. Petersburg home, you can use InstaBids to request contractor bids.

How do I apply for a building permit in St. Petersburg?

St. Petersburg instructs applicants to prepare plans, complete a building permit application and add the applicable forms. The city’s electronic-submittal process gives applicants ten business days to complete uploads or correct initial comments; an uncorrected application is denied and its workflow terminated.

Once the plans are ready to be submitted, complete a building permit application form and any other applicable forms to submit with your plans.

Source: Building Permits, read 2026-11-03

To reactivate the terminated workflow, the applicant needs to contact ePlan review staff.

Source: Building Permits; read 2026-11-03.

You can describe the St. Petersburg work behind your permit application on InstaBids to invite bids on that scope.

Do I need a permit for a fence in St. Petersburg?

St. Petersburg’s exemption list includes wood, chain link, plastic and wrought iron fences on single-family residential property when installed under Land Development Regulations Section 16.40.040. The entry requires contacting Sunshine 811 two full business days before digging.

On single family residential property, any wood, chain link, plastic or wrought iron fences installed per Land Development Regulations, Section 16.40.040 of the local zoning code. Property owner must contact Sunshine 811 two (2) full business days prior to digging. For more information go to www.sunshine811.com or dial 811.

Source: City of St. Petersburg — List of Exempted Permits, 2014-01-01, read 2026-11-03

The exemption document states that separate trade permits or certificates may still be required. Historic-district properties may not be exempt, and its flood-zone exception covers projects with a submitted permit application and construction documents identifying otherwise exempt work.

Source: Building Permits; read 2026-11-03.

For a fence project in St. Petersburg, post your scope on InstaBids and choose among the written bids.

Describe your fence in St. Petersburg

What work does not need a permit in St. Petersburg?

St. Petersburg’s list identifies connecting an ice maker within an existing single-family residence or residential duplex as work for which a plumbing permit may not be required. Exempt work must still comply with the Florida Building Code and other city laws or ordinances.

The connection of an ice maker within an existing single family residence or residential duplex.

Source: City of St. Petersburg — List of Exempted Permits, 2014-01-01, read 2026-11-03

Exemptions from the permit requirements shall not authorize any work to be done in any manner in violation of the provisions of the Florida Building Code or any other laws or ordinances of the City.

Source: City of St. Petersburg — List of Exempted Permits, 2014-01-01, read 2026-11-03

Separate trade permits or certificates may still apply. Historic-district properties may not be exempt; the list also identifies flood-zone projects with a submitted application and construction documents as an exception.

Source: Building Permits; read 2026-11-03.

To arrange an improvement covered by the St. Petersburg exemption guidance, you can request written bids through InstaBids.

Do wired hurricane shutters need a permit in St. Petersburg?

St. Petersburg’s exemption document distinguishes hurricane shutters wired directly to an electrical power source: that installation requires an electrical permit. The document places this requirement in its electrical-permit guidance, with the direct power connection as the operative condition.

Hurricane shutters wired directly to an electrical power source shall require the issuance of an electrical permit.

Source: City of St. Petersburg — List of Exempted Permits, 2014-01-01, read 2026-11-03

Source: Building Permits; read 2026-11-03.

For electrical work on hurricane shutters in St. Petersburg, describe the project on InstaBids to invite written bids.

Describe your electrical in St. Petersburg

St. Petersburg permit time windows and records

Initial electronic-submittal corrections — St. Petersburg, read 2026-11-0310 business days; denial and workflow termination if not corrected; contact ePlan staff to reactivate.Building Permits, St. Petersburg, read 2026-11-03
Drawings for optional preliminary plan review — St. Petersburg, read 2026-11-03At least 7 business days before the meeting; drawings emailed as PDF.Building Permits, St. Petersburg, read 2026-11-03
Contractor history in Click2Gov — St. Petersburg, read 2026-11-03Past 10 years; a user account is required for contractor history.Click2Gov Building Permit, St. Petersburg, read 2026-11-03

Download this table: CSV · JSON

Sources

InstaBids assistantAI · builds your written scope with you

What fence or electrical do you need done in St. Petersburg? Describe it once to start your written scope.

Start from a common job
You choose who gets your number
Or send it from your own AIChatGPTClaudeGrokGeminiMore ways
InstaBids

For your AI assistant

MCP connector · REST API · plain HTML

Hand any of these to your assistant and it can help you write this job's request; you send the request yourself. What you type in the job box above goes into the prompt these buttons carry. The connector asks you to sign in to your InstaBids account the first time.

  • MCP connector URLhttps://instabids.ai/api/agent/mcp
  • Agent API (OpenAPI)https://instabids.ai/openapi.json
  • Start-request linkhttps://instabids.ai/intake?from=permits-pinellas--st-petersburg--building-permits&utm_source=permits&utm_medium=page&utm_campaign=permits-v3
Open it in your assistantAdd InstaBids as a connector

Every page is plain HTML. Steps for every assistant: add to your assistant.

Start my requestUse your AI