What are the warning signs when hiring an AC contractor in Florida?
Check an AC offer for unsupported equipment sizing, unexplained refrigerant recommendations, missing permit responsibility and payment pressure before deciding what Florida home cooling work to authorize.
Source: ENERGY STAR contractor selection guidance, read 14 October 2026.
Source: EPA homeowner refrigerant questions, read 14 October 2026.
Source: Palm Beach permit and contractor guidance, read 14 October 2026.
Source: FTC payment cautions and cancellation checklist, read 14 October 2026.

Key facts
- ENERGY STAR says a contractor should size the system based on the size of the house, insulation and windows.
Source: ENERGY STAR contractor selection guidance, read 14 October 2026.
- EPA says homeowners are not required to replace existing equipment that uses HCFC-22.
Source: EPA homeowner refrigerant questions, read 14 October 2026.
- Palm Beach advises not to make the final payment until the permit is closed out.
Source: Palm Beach permit and contractor guidance, read 14 October 2026.
- DBPR lists requests for large, upfront cash payments among unlicensed activity warning signs.
Source: DBPR advance-payment warning, read 14 October 2026.
- Section 489.126(2)(a) sets permit-application and work-start deadlines after a qualifying initial payment, with stated exceptions.
Source: F.S. 489.126, read 14 October 2026.
What should a written quote include before I pay anything?
Ask for the AC model numbers, proposed capacity assessment, start date and warranty information in a written proposal; ENERGY STAR recommends evaluating the home and existing system, so an unexplained larger replacement is a reason to request the sizing basis.
Source: ENERGY STAR contractor selection guidance, read 14 October 2026.
InstaBids gets you competitive written quotes without calls or home visits to bid; contractors never buy leads, and there is no fee during our pilot.
Post your requestBuild the equipment description from the labels already on your system. Note the indoor and outdoor models if you can read them without opening equipment. Record which rooms are uncomfortable and when the problem occurs. Describe symptoms such as uneven temperatures or repeated interruptions without assigning a mechanical cause.
ENERGY STAR's guidance connects sizing to the home's size, insulation and windows. It also calls for attention to ducts and airflow. Ask when the contractor will assess those conditions and what remains provisional in an estimate made from photographs. A bigger unit should not be presented as an explanation for every comfort problem.
Source: ENERGY STAR contractor selection guidance, read 14 October 2026.
If the sales discussion moves directly from a warm room to replacing all equipment, request the diagnosis in writing. Ask which observations support replacement, what alternatives the contractor considered and which problem the proposed work is intended to address. These questions seek the contractor's reasoning; they do not ask you to calculate equipment capacity yourself.
| Proposed AC work | Missing explanation to request |
|---|---|
| Increase in capacity | The home assessment supporting the selection and any unresolved assumptions. |
| Replace only part of a system | The exact component and the contractor's explanation of how the proposed combination will function. |
| Add refrigerant repeatedly | Findings about leakage and the proposed repair, not just another service visit. |
| Change the refrigerant | Identification of the existing refrigerant and the system changes being proposed. |
| Omit permits from the proposal | The applicable authority's answer and who will handle any required application. |
| Complete installation | The startup, operating instructions and documents included in the handover. |
The table combines the official assessment and refrigerant guidance with editorial questions about the proposed installation.
Source: ENERGY STAR contractor selection guidance, read 14 October 2026.
Source: EPA homeowner refrigerant questions, read 14 October 2026.
Source: Palm Beach permit and contractor guidance, read 14 October 2026.
EPA advises homeowners to ask technicians to locate and repair leaks instead of repeatedly adding refrigerant to a leaking system. For R-22 equipment, EPA's homeowner guidance says existing units need not be replaced merely because of the phaseout. A claim that every existing R-22 system must immediately be discarded deserves a source and an explanation.
Source: EPA homeowner refrigerant questions, read 14 October 2026.
For equipment containing HCFC-22, EPA advises making sure the technician has the required EPA Section 608 certification to service it.
Source: EPA homeowner refrigerant questions, read 14 October 2026.
Ask the contractor to identify the refrigerant from the equipment information. EPA says that identification is typically on the nameplate and explains that R-22 has no drop-in replacement requiring no component changes. Have the contractor describe any proposed conversion; leave refrigerant handling and technical assessment to the technician.
Source: EPA homeowner refrigerant questions, read 14 October 2026.
For permitting, use the property's jurisdiction rather than a general statement that a job is small. Palm Beach's guidance says to obtain a permit when applicable and wait for closeout before final payment. Ask the local building department about the specific proposed replacement or alteration, and record the answer.
Source: Palm Beach permit and contractor guidance, read 14 October 2026.
The FTC’s contract checklist includes “a written statement of your right to cancel the contract within three business days, if you signed it in your home or at a location other than the seller’s permanent place of business”.
Source: FTC payment cautions and cancellation checklist, read 14 October 2026.
How big a deposit is normal under Florida law?
Compare an AC equipment-order deposit with the residential payment trigger in F.S. 489.126(2)(a); the provision concerns applying for necessary permits and starting work, including stated exceptions, rather than establishing a normal advance payment for a condenser, air handler or installation package.
Source: F.S. 489.126, read 14 October 2026.
Read the exact language of F.S. 489.126(2)(a), accessed 14 October 2026:
“A contractor who receives, as initial payment, money totaling more than 10 percent of the contract price for repair, restoration, improvement, or construction to residential real property must:”
Source: F.S. 489.126, read 14 October 2026.
“1. Apply for permits necessary to do work within 30 days after the date payment is made, except where the work does not require a permit under the applicable codes and ordinances, and”
Source: F.S. 489.126, read 14 October 2026.
“2. Start the work within 90 days after the date all necessary permits for work, if any, are issued,”
Source: F.S. 489.126, read 14 October 2026.
“unless the contractor has just cause for failing to apply for the necessary permits, starting the work, or refunding the payment, or unless the person who made the payment agreed, in writing, to a longer period to apply for the necessary permits or start the work or to longer periods for both.”
Source: F.S. 489.126, read 14 October 2026.
The passage supplies no customary AC deposit and no universal ceiling. It is reproduced as statutory information, not legal advice. A Florida attorney can address how the payment, proposed work and any written extension affect a particular agreement.
Source: F.S. 489.126, read 14 October 2026.
Ask the installer to identify the equipment associated with an ordering payment. Record the model designation and what happens if the specified unit is unavailable. Have the business explain the proposed substitution process before an order becomes the reason you are asked to accept a different system.
Make the installation sequence understandable. Equipment arrival, removal of the old unit, installation and required inspections are separate events to discuss. Ask which of these the payment schedule uses. If a seller describes an advance as a reservation, request an explanation of exactly what is reserved and the written terms attached to it.
Keep access arrangements in the same schedule. An attic installation or work inside a condominium may require coordination you need to discuss. Tell the contractor about known access constraints and ask which other arrangements it expects you to make. This is scheduling preparation, not a determination of building requirements.
What are warning signs in how a contractor asks to be paid?
Check an AC payment schedule for a large advance without a stated purpose, cash-only terms, pressure to sign today and no contractor address; FTC guidance flags immediate decisions and cash-only or full-upfront payment, and recommends including the business address in the contract.
Source: FTC payment cautions and cancellation checklist, read 14 October 2026.
A cooling failure can make a fast decision feel necessary. Ask the seller to separate any proposed immediate service from a complete replacement. Request the work description for each option and clarify what you would authorize now. Do not let a conversation about today's discomfort leave the larger purchase undefined.
DBPR's 16 May 2025 bulletin lists "Requests for large, upfront cash payments" among its unlicensed-activity warning signs. For an equipment purchase, request an explanation tied to the proposed system and installation; a vague claim about stock availability leaves the payment's purpose unresolved.
Source: DBPR advance-payment warning, read 14 October 2026.
If the proposed reason for replacement is a refrigerant rule, ask for the rule and the connection to your equipment. EPA's R-22 guidance distinguishes continued use of existing equipment from changes in refrigerant production. Keep the technical explanation separate from a demand to sign before you can compare another written proposal.
Source: EPA homeowner refrigerant questions, read 14 October 2026.
Ask for a written account of any change after the initial assessment. If the contractor revises the capacity, equipment combination or duct work, request the revised scope before considering the associated payment. Keep the earlier version so you can identify whether the recommendation changed or a previously omitted task was added.
When payment instructions arrive from a different name, request clarification through the contracting business. Ask for an invoice identifying the job and the purpose of the requested amount. Keep that correspondence with your accepted equipment schedule. This provides a record without presuming that a different payee necessarily means wrongdoing.
For a proposal that excludes permits, ask the installer to explain the exclusion to the building department responsible for your address. A statement that the equipment will operate does not answer the permit question. Obtain the department's response before treating an omitted administrative step as resolved.
Source: Palm Beach permit and contractor guidance, read 14 October 2026.
What should I do if the work stops?
Start with an AC installation timeline naming delivered equipment, completed tasks and outstanding inspections; as checked 14 October 2026, the official routes are DBPR's profession-specific complaint process, FDACS's business-complaint service and the local building department responsible for the property.
Source: DBPR complaints, read 14 October 2026.
Source: FDACS complaints, read 14 October 2026.
Source: Palm Beach permit and contractor guidance, read 14 October 2026.
Record the models delivered and the work the installer says has been completed. Distinguish a unit being placed on its base from an installation described as ready for use. Ask the contractor to identify the remaining work and explain whether the system can be operated. Do not open electrical or refrigerant components to investigate a dispute.
Preserve job sheets and any readings or startup documents the business has supplied. Keep your descriptions factual: where the equipment is, whether the installer returned and which promised documents are absent. If the contractor's explanation uses unfamiliar terms, ask it to translate them into the specific unfinished task.
Submit a regulated-trade concern through DBPR's complaint route, choosing Construction Industry where appropriate. DBPR's published role is administrative, and some disagreements about terms or workmanship are beyond its authority. A complaint is not a substitute for advice about recovering money.
Source: DBPR complaints, read 14 October 2026.
FDACS accepts business complaints even when it does not regulate the particular industry. Explain whether your unresolved issue concerns equipment supplied, installation left incomplete or another specific part of the transaction. Attach the relevant agreement and correspondence as the form requests.
Source: FDACS complaints, read 14 October 2026.
For the permit record, use the department that serves the installation address. Palm Beach's contractor directory links permit and inspection searches; Broward's building complaint information explains its local enforcement routes and limits. Ask where to report any unresolved inspection or site concern.
Source: Palm Beach permit and contractor guidance, read 14 October 2026.
Source: Broward reporting directory, read 14 October 2026.
Prepare a concise description for each office. An equipment model discrepancy and an inspection issue may need different supporting documents even when they arise from the same job. Retain submission receipts and follow the office's instructions. Seek legal advice before deciding how a continuing dispute affects further payments or ending the agreement.
How does InstaBids work, in one paragraph?
Homeowners pay InstaBids nothing. Contractors who take part estimate from your photos and a written scope card, so nobody visits before you see any prices. The contractor you pick may visit once before settling the final price against the percentage the bid stated.
Source: How InstaBids works, read 14 October 2026.
Contractors in your trade see the scope card, your photos and your 5-digit ZIP code.
Source: How InstaBids works, read 14 October 2026.
Contact details stay hidden until the homeowner picks a contractor and they confirm the connection. The contact-detail filter can miss disguised contact details.
Source: Pilot FAQ, read 14 October 2026.
Where can I look up public records myself?
Choose an optional Florida DBPR licence lookup for the AC contracting identity and an optional DFS workers' compensation search for the employer; date each result yourself and ask the relevant agency about uncertainty.
Source: DBPR search, read 14 October 2026.
Source: DFS employer records, read 14 October 2026.
Use DBPR's public search with the contractor number or name you were given. Read the category displayed. DBPR publishes different air-conditioning and mechanical scopes, so an equipment seller's description of its services is not the agency's category definition.
Source: DBPR search, read 14 October 2026.
Source: AC and mechanical scopes, read 14 October 2026.
The construction-industry category page distinguishes Class A, B and C air-conditioning work and mechanical contracting. Ask DBPR about the proposed operation when the scope is unclear, particularly if the proposal adds work beyond the cooling equipment itself.
Source: AC and mechanical scopes, read 14 October 2026.
Identify the employer of the installation crew before opening DFS Proof of Coverage. The database contains selected carrier-reported information. Record the business searched and the date, then take questions about the displayed result to DFS rather than interpreting it as a promise about this installation.
Source: DFS employer records, read 14 October 2026.
Keep a separate note for technical questions. A database result will not supply the contractor's sizing assessment, explain an R-22 recommendation or tell you why a particular duct alteration was proposed. Bring those questions back to the installer and ask for its explanation in the written scope before choosing.
Next: Florida hiring checklist, How InstaBids works.
Home jobs in Broward and Palm Beach counties. InstaBids is new in your area, so finding contractors can take longer, and a request may get no bids.
Source: Pilot FAQ, read 14 October 2026.
Sources for the facts on this page
Read ENERGY STAR for home assessment and equipment selection, EPA for R-22 servicing guidance and Palm Beach's checklist for applicable permit closeout; Florida payment law and official complaint directories supply the remaining factual anchors, while the installation questions are editorial prompts.
Sources checked: 14 October 2026.
- ENERGY STAR contractor selection guidance.
- EPA homeowner refrigerant questions.
- Palm Beach permit and contractor guidance.
- FTC payment cautions and cancellation checklist.
- F.S. 489.126.
- DBPR advance-payment warning.
- DBPR complaints.
- FDACS complaints.
- Broward reporting directory.
- DBPR search.
- AC and mechanical scopes.
- DFS employer records.
- How InstaBids works, checked 14 October 2026.
- Pilot FAQ, checked 14 October 2026.
Parent: InstaBids home.