InstaBids

How do I check an electrical contractor in Florida myself?

Check the electrical business through a DBPR licence record, Broward's contractor card or Palm Beach's Certificate of Competency, and Florida DFS workers' compensation coverage or exemption records, with the date of each optional search recorded.

Source: DBPR lookup, read 14 October 2026.
Source: DBPR electrical Board FAQ, read 14 October 2026.
Source: Broward county card, read 14 October 2026.
Source: Palm Beach Certificate of Competency, read 14 October 2026.
Source: Carrier-reported DFS coverage, read 14 October 2026.
Source: DFS person search, read 14 October 2026.

Last checked: 14 October 2026

A weatherproof outdoor outlet and a straight gray conduit run on a stucco wall.

Key facts

Which public records can I look up for an electrical contractor?

Use DBPR's electrical licence record, including certified electrical contractor (EC), the Broward contractor card search or Palm Beach Certificate of Competency, and Florida DFS workers' compensation Proof of Coverage or exemption search. All three are optional public-record lookups you perform and date yourself.

Source: DBPR lookup, read 14 October 2026.
Source: DBPR electrical Board FAQ, read 14 October 2026.
Source: Broward county card, read 14 October 2026.
Source: Palm Beach Certificate of Competency, read 14 October 2026.
Source: Carrier-reported DFS coverage, read 14 October 2026.
Source: DFS person search, read 14 October 2026.

Ask the bidder for the exact licence number and the business that will sign your agreement. Keep those identifiers with a plain-language list of the work: replacing a panel, adding a circuit or changing fixtures. If several businesses appear in the paperwork, ask which one is responsible for each task.

InstaBids gets you competitive written quotes without calls or home visits to bid; contractors never buy leads, and there is no fee during our pilot.

Post your request

How do I read the state licence record?

Read the expiry date and the name of record; confirm future expiry and match the DBPR entry to the company on your contract. A certified electrical contractor (EC) covers electrical and alarm work; registered electrical licensees can work only where they hold a local licence. Read any specialty limits separately.

Source: DBPR electrical Board FAQ, read 14 October 2026.
Source: How to check a contractor licence, read 14 October 2026.

The residential specialty description covers residences with one through four families, no more than two stories, and single-phase service limited to 400 amperes. Ask the bidder to explain whether its category fits the premises and service involved; do not infer the category from a van's description of its services.

Source: DBPR electrical Board FAQ, read 14 October 2026.

As of 14 October 2026, DBPR's construction FAQ explains the status Current, Active as a current licence with practice allowed within its scope. Use that explanation to understand the status wording, and direct electrical category or status questions to the Electrical Contractors' Licensing Board.

Source: Current/active status, read 14 October 2026.
Source: DBPR electrical Board FAQ, read 14 October 2026.

DBPR says certified electrical licensees can work anywhere in Florida; registered licensees can work only in the counties or municipalities where they hold a local licence.

Source: DBPR electrical Board FAQ, read 14 October 2026.

Do not reduce an electrical entry to the word electrical. DBPR distinguishes the EC category, which covers all electrical and alarm work, from specialties. Its residential electrical specialty describes work in a one-, two-, three- or four-family residence no higher than two stories, with the service limited to single phase and 400 amperes. Read those premises and service conditions together rather than relying on a partial category title.

Source: DBPR electrical Board FAQ, read 14 October 2026.

For a proposed service change, ask the electrician to state which category the offer relies on and whether a specialty restriction is relevant. Leave technical assessment of the existing service to the contractor. Your public-record note should identify the category, its displayed status and the proposed operation; it should not claim that a photograph establishes the service configuration.

A mixed proposal may include lighting, panel work and an alarm task. Ask whether one business signs for all of it or whether separate agreements are proposed. Write down the entity responsible for each agreement before attaching a lookup result to the project. Bring a precise scope question to the Electrical Contractors' Licensing Board when the category and offer appear inconsistent; a residential specialty description is not the same as the unlimited EC description.

Source: DBPR electrical Board FAQ, read 14 October 2026.

Does the county also keep a record?

Use the county record alongside the electrical licence, especially for a registered contractor: DBPR limits registered electrical practice to counties or municipalities where the holder has a local licence. Broward and Palm Beach each provide a contractor search route.

Source: Broward county card, read 14 October 2026.
Source: Palm Beach contractor directory, read 14 October 2026.
Source: Palm Beach Certificate of Competency, read 14 October 2026.
Source: DBPR electrical Board FAQ, read 14 October 2026.

Broward's search has a field labelled 'CC Number' for the county card number; a DBPR state licence number belongs in the DBPR search instead.

Source: Broward county card, read 14 October 2026.
Source: DBPR lookup, read 14 October 2026.

A registered electrician's local territory matters even when the state entry is current. Put the installation address in your question to the county, along with the electrician's individual name and contracting business. Ask which local record corresponds to that state registration.

Source: DBPR electrical Board FAQ, read 14 October 2026.

Palm Beach links the county search from Contractor Regulations. For Broward, enable JavaScript and session cookies in the card form; contractor and company name searches are available. Alternatively, use the contractor-record phone line on Broward's Building Code page.

Source: Palm Beach contractor directory, read 14 October 2026.
Source: Broward county card, read 14 October 2026.
Source: Broward record enquiries, read 14 October 2026.

How can I check workers' compensation coverage?

Check Florida DFS records yourself if you want a dated workers' compensation lookup for the electrical employer. Ask who employs the people performing panel work and any separate trenching crew; retain those names alongside the written scope before searching.

Source: Carrier-reported DFS coverage, read 14 October 2026.

DFS explains that its Proof of Coverage database reflects selected information reported by carriers. Keep the date and employer result without converting it into a conclusion about everyone who might attend the job. If the company proposes another employer, ask for that name and refer record questions to DFS.

Source: Carrier-reported DFS coverage, read 14 October 2026.

An owner may provide an exemption record for your optional review. DFS says exemptions are issued to corporate officers and LLC members, not to the business. Its separate exemption search is linked below; keep the person's identity distinct from your list of people expected on site.

Source: Officer/member exemptions, read 14 October 2026.
Source: DFS person search, read 14 October 2026.

DFS says “Upon issuance of an exemption, the officer or member is not considered an employee of the business and may not recover workers' compensation benefits.”

Source: Officer/member exemptions, read 14 October 2026.

What should I ask for in writing about insurance?

Ask the electrical business for a certificate of insurance naming you as certificate holder and identifying your project address. Keep the request with the panel or circuit scope, and ask the insurer to explain the document rather than drawing conclusions from it yourself.

Source: FTC estimate and insurance checklist, read 14 October 2026.

If another firm is proposed for excavation or closing wall openings, ask who contracts for that work and request the relevant business details separately. Keep document questions and work boundaries in writing. A request about a certificate should identify what you need to receive without selecting policy terms.

Palm Beach asks homeowners to request “Liability and Workers Compensation insurance”.

Source: Palm Beach contractor directory, read 14 October 2026.
Source: FTC estimate and insurance checklist, read 14 October 2026.

How do I describe the electrical job before checking anyone?

Describe the equipment you want to use and its location before requesting an electrical design. List panels, circuits and fixtures separately in your written scope, attaching accessible label photographs without opening equipment or attempting measurements.

Do not remove a panel cover to prepare a request. Describe what you can see and the equipment you want to use. Ask the contractor to specify what investigation remains necessary before committing to a design, so a record lookup does not substitute for an assessment of your electrical work.

Build a use-based request before asking for a technical design. List the equipment you want to operate, where it will be located and the installation information you already have from its manufacturer. Ask the electrician to determine what assessment is needed; do not infer circuit or service capacity from the appearance of an outlet.

For a kitchen change, identify which appliances remain and which are proposed replacements. For a garage request, describe the equipment and its intended location. For an exterior fixture, specify the location and whether you are asking about a replacement or a new installation. Keep model information attached to the correct item.

Record symptoms separately: the location of an intermittent problem, when you notice it and what equipment is in use. Ask for an investigation proposal instead of instructing the bidder to replace an unexamined component. Do not open equipment, remove covers or attempt electrical measurements to complete the request.

Build the electrical request around intended functions. The electrician should translate those functions into a technical proposal; a homeowner's worksheet need not specify conductors, protective devices or service design.

Intended useInformation to attachInstallation question
Appliance additionManufacturer's installation document and intended room locationWhat assessment of the existing installation is needed before a circuit design can be proposed?
Garage equipmentEquipment identification and the place it will be usedWhere would the proposed supply terminate, and which route and access openings are contemplated?
Kitchen changesSeparate lists of retained appliances and proposed replacementsWhich connections are being changed, and which existing circuits remain outside the request?
LightingRoom-by-room fixture locations and any products you intend to supplyIs each task a replacement at an existing point or creation of a new installation point?
ControlsThe switching or control function you want at each locationWhich devices and wiring changes form part of the offer, and what awaits assessment?
Panel operationWhether replacement, relocation or a service change has been proposedWhat equipment remains, what utility coordination is anticipated, and who handles it?
Access restorationWall, ceiling or exterior surfaces on a proposed routeWho opens each surface and who restores it to the finish described in the agreement?

For an observed symptom, record its location and circumstances separately from these additions. Ask for an investigation proposal; do not turn the symptom into your own conclusion that a particular component must be replaced.

Keep the eventual technical proposal distinct from your initial request. Ask the contractor to explain unfamiliar terms and identify any requested function that its design leaves out. A clear description of the intended use gives you something concrete to compare with the work offered.

Request a responsibility note if the electrical proposal depends on another operation. For example, ask who prepares an access route and who closes it afterward, or who arranges a required utility appointment. Identify the business responsible for that step before assuming the electrician's agreement includes it.

If equipment selection changes, retain the revised manufacturer information with the contractor's revised description. Ask whether the planned installation, permit discussion or attendance arrangements also change. Keep your decision in the same correspondence thread or project folder so a superseded equipment choice does not remain the basis of the work.

How does InstaBids work, in one paragraph?

Homeowners pay InstaBids nothing. Contractors who take part estimate from your photos and a written scope card, so nobody visits before you see any prices. The contractor you pick may visit once before settling the final price against the percentage the bid stated.

Source: How InstaBids works, read 14 October 2026.

Contractors in your trade see the scope card, your photos and your 5-digit ZIP code.

Source: How InstaBids works, read 14 October 2026.

Contact details stay hidden until the homeowner picks a contractor and they confirm the connection. The contact-detail filter can miss disguised contact details.

Source: Pilot FAQ, read 14 October 2026.

What should I do before I sign?

Ask for a circuit-by-circuit or equipment-by-equipment written scope before accepting electrical work. Distinguish replacing a panel from adding circuits or changing service capacity, and request an explicit answer about permit responsibility, shutdown arrangements and restoration of access openings.

Source: FTC estimate and insurance checklist, read 14 October 2026.
Source: Florida Statutes section 489.505, read 14 October 2026.

Section 489.505 describes electrical contracting through work on wiring, fixtures, appliances, apparatus, raceways and conduit. Use those categories to organise your questions: what equipment changes, what wiring stays, which routes are proposed and which other tasks are outside this particular agreement.

Source: Florida Statutes section 489.505, read 14 October 2026.

Ask the contractor to list what must be assessed before the installation can be scheduled. Keep utility arrangements, inspection responsibility and any changes requested after assessment in the accepted proposal. Send an identical description to other bidders so you can compare responses to the same electrical project.

Next: How to check a contractor licence, Florida contractor licence guide, Florida hiring checklist.

Home jobs in Broward and Palm Beach counties. InstaBids is new in your area, so finding contractors can take longer, and a request may get no bids.

Source: Pilot FAQ, read 14 October 2026.

Sources for the facts on this page

Read the Electrical Contractors' Licensing Board FAQ for the category's limits and section 489.505 for electrical scope; the construction FAQ supplies the cited status wording, while county and DFS pages provide optional lookup routes.

Sources checked: 14 October 2026.

Parent: InstaBids home.